Similar Projects
Southern Sarpy County Regional Wastewater System - Phase 1A
New Construction, Infrastructure
Post-Bid
$12,000,000 CJ est. value
Springfield, NE 68059

SID 341 North Shore 2, Paving, Section 1
Infrastructure
Post-Bid
$440,000 CJ est. value
Papillion, NE 68046

156th Street Improvements, South of Bennington Road Grading, Paving, and Storm Sewer Construction Rebid
Infrastructure
Results
$623,156 CJ est. value
Bennington, NE 68007

Pedersen Basement Rim Joist and Pipe Insulation - 2022
Renovation
Results
$99,950 CJ est. value
Lincoln, NE 68508

CIPP Point Liner Kits - Pipe Repair
Alteration
Post-Bid
Lincoln, NE

Water Main Installation, Section 1
Infrastructure
Results
$482,719 CJ est. value
Omaha, NE 68102

Cast Iron and Malleable Iron Pipe Fittings, Pipe Nipples Weld Fittings and Weld Flanges
Term Contract
Post-Bid
Omaha, NE 68106

2022 Standpipe Improvements
Infrastructure
Results
$518,357 CJ est. value
Martinsburg, NE 68770

City Office South Drive
Infrastructure
Post-Bid
$140,000 CJ est. value
Crete, NE 68333

Oak Leaf Storm Sewer Phase 1
Infrastructure
Results
$2,688,328 CJ est. value
Papillion, NE 68046

Gothenburg Industrial Park 3rd - Phase I Infrastructure
Infrastructure
Post-Bid
$200,000 CJ est. value
Gothenburg, NE 69138

Sand Draw Creek - Net Phases 3 and 4
Infrastructure
Results
$3,051,311 CJ est. value
Valentine, NE 69201

Bee Lift Station Renovation
Renovation
Post-Bid
$200,000 CJ est. value
Bee, NE 68314

New Wastewater Treatment Plant Contract 2
New Construction, Infrastructure
Results
$66,999,000 CJ est. value
Plattsmouth, NE 68048

Removal and Installation of Commercial Water Heaters
Renovation
Post-Bid
$70,000 CJ est. value
Grand Island, NE 68801

Last Updated 01/03/2024 06:35 PM
Project Title

Sanitary sewer manhole rehabilitation

Physical Address View project details and contacts
City, State (County) Grand Island, NE 68801   (Hall County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $689,558 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor agrees to furnish all equipment, labor, material and supplies, etc. needed to perform the work. The intent of the plans and specifications is to provide for the construction and completion of every detail of the work described therein. It shall be understood by the Contractor that Contractor will furnish all labor, materials, tools, transportation, and supplies required for all or any part of the work to make each item complete in accordance with the spirit of the contract. It is understood that the apparent silence of the specifications as to any detail or the apparent omission of a detailed description concerning any point shall be regarded as meaning that only the best general practice is to prevail and that only materials and workmanship of the first quality are to be used. For the purpose of design and the preparation of the Engineer's Estimate, the City may perform a reasonable amount of exploratory work to gain information relative to surface and subsurface conditions relating to type of soil, moisture content, and types and extent of rock strata.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents