Similar Projects
West Point Warning System Upgrade
Alteration
Design
$1,700,000 est. value
WA

Telephone System Replacement
Alteration
Bidding
Everett, WA

Network Switching and Wireless Project
Alteration
Bidding
Cowiche, WA

Ospinsight Database Management And Maintenance And Fiber Optic Network Field Survey
Infrastructure
Post-Bid
$50,000 est. value
WA

Alarm and Video Surveillance System
Alteration
Post-Bid
East Wenatchee, Wenatchee, WA 98802

Hudson's Bay Conduit Connection
Alteration
Results
Vancouver, WA 98687

Council Chambers Audio/Visual Upgrade
Alteration
Results
$30,000 est. value
Mukilteo, WA 98275

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA

Tube Transfer System Upgrade
Renovation, Alteration
Bidding
$52,000 est. value
WA

Light Rail Vehicle Electronic Suite Upgrade
Term Contract, Infrastructure, Alteration
Post-Bid
Seattle, WA

Upgrading Locution Alerting System
Alteration
Results
$40,000 to $50,000 est. value
Marysville, WA 98271

Public Schools Fire And Security System Maintenance Repair And Installation
Alteration
Post-Bid
Federal Way, WA

Downtown Campus DAS for the County-City Building and Jails
Alteration
Results
$1,100,000 est. value
Tacoma, WA 98402

JH Performing Arts Center - Lighting and AV Upgrades
Alteration
Post-Bid
WA

ISB TI Improvements
Alteration
Results
$870,477 est. value
Bellingham, WA

Reported 11/25/2021 12:00 AM
Project Title

Cablecast VIO4 and Cablecast CG Bulletin Board

Physical Address View project details and contacts
City, State (County) Tacoma, WA   (Pierce County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $85,000 to $115,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Cablecast VIO4 playback system and a separate Cablecast CG Bulletin Board System is to be provided, installed and fully integrated according to the Build Specification into the City of Tacoma Master Control Center and Central Equipment Room. As-built drawings provided upon completion along with hardware and software extended warranties (to 5 years) as outlined in the Specification document, along with training.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents