Similar Projects
FY 2022 Tree and Vegetation Removal
Conception
$100,000 est. value
Cedar Rapids, IA

Herbicide Application at 17 Sites - MN, WI and IA
Term Contract
Design

Herbicide Application at 17 Sites - MN, WI and IA
Term Contract
Design

Cemetery Mowing
Alteration
Bidding
Cushing, IA

Mowing and Trimming at Saylorville Lake
Term Contract
Bidding
Des Moines, IA

Grinding of Stumps in the ROW
Term Contract
Post-Bid
Hiawatha, IA 52233

Stump Grinding
Alteration
Post-Bid
Cedar Rapids, IA

National Shrine Raise And Realign, Turf Renovation, Clean Headstone/Markers
Results
Fort Smith, AR - Keokuk, IA - Bloomington, Indianapolis, IN 46208

Vegetation Removal at Veteran Memorial Parkway Expansion
Term Contract
Results
Davenport, IA

Douglas Avenue Urbanization Plantings
Alteration
Bidding
$620,000 est. value
Urbandale, IA 50322

Ash Tree Removal
Alteration
Post-Bid
Cedar Rapids, IA

Walnut Street Streetscape Phase 1
Infrastructure, Alteration
Results
Dallas Center, IA

2022 Spring Tree Planting
Alteration
Bidding
Cedar Rapids, IA

E of Merle Hay Road Phase 4 Bioretention Planting
Alteration
Post-Bid
Johnston, IA 50131

2021 Windsor Heights Site Management Services
Term Contract
Results
Windsor Heights, IA

Reported 02/09/2022 12:00 AM
Project Title

Tree Planting Project at Yellow River State Forest

Physical Address View project details and contacts
City, State (County) Harpers Ferry, IA 52146   (Allamakee County)
Category(s) Single Trades
Sub-Category(s) Landscaping/Irrigation
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located in the Driftless Area of the Upper Midwest in the Paint Creek Unit of Yellow River State Forest in section 1, Linton Township (T96N, R4W) in Allamakee County, Iowa (UTM 641960 E, 4779788 N). This project involves planting bareroot seedlings on three retired crop fields (21.9 acres, 4.8 acres, 11.7 acres) totaling 38.4 acres. The soils are mostly Fayette and Dubuque silt loams. All three fields drain into the Paint Creek watershed. The ground cover at the time of planting will be corn stubble residue. Corn stocks were baled by the farmer the previous fall.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents