Similar Projects
Martell Court Pump Station Headworks Upgrades
Renovation
Bidding
$1,225,000 est. value
Keene, NH 03431

Wastewater Pump Station Improvements
Post-Bid
Less than $600,000 est. value
Stewartstown, NH

Derryfield Pump Station Improvements
Results
Manchester, NH

Madbury Backwash Tank and Pump Station Upgrade
Renovation
Results
Less than $2,200,000 est. value
Madbury, NH 03801

Webster Stream Intake
Construction
Center Barnstead, NH

Library Street Sewer Replacement and Suncook Pond Pump Station and Force Main
Results
Less than $1,500,000 est. value
Allenstown, NH 03275

Pump Station No. 1 Improvements, Foster St Generator Replacement, Phase 1A Septage Improvements
Results
Less than $2,200,000 est. value
Plymouth, NH

Drummer Hill Pump Station Replacement
Results
Keene, NH

Hannah Dustin Pump Station Upgrades
Results
Less than $425,000 est. value
Concord, NH 03301

Water Pollution Control Facility Ejector Station and Remote Pump Station Upgrades
Renovation
Results
Less than $402,000 est. value
Berlin, NH

Water Treatment Plant Finished Water Pump Station Project
Results
Less than $5,000,000 est. value
Concord, NH

2020 Prospect Booster Station Piping Upgrade
Results
Lebanon, NH 03766

Waste Water Treatment Facility Phase III Upgrade
Results
Less than $16,780,000 est. value
Merrimack, NH

Route 11 Pump Station Upgrade
Results
Rochester, NH

Southern New Hampshire Regional Water Project - Contract P2 - East Road Pump Station
Results
Plaistow, NH

Last Updated 07/19/2021 11:33 AM
Project Title

Wastewater Pump Station Upgrades - Phase 2

Physical Address View project details and contacts
City, State (County) Nashua, NH   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project will rehabilitate or replace eight separate wastewater pump stations in a variety of measures that include, but are not limited to: structural, architectural, mechanical, electrical and control systems (including retaining the services of Electrical Installations, Inc., Moultonborough, NH, (the City’s preferred System Integrator) and all materials and equipment, services and construction inherent to the work. Bypass pumping during construction will be required.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents