Similar Projects
HCA Acute Care Hospital
New Construction, Infrastructure
Conception
$41,900,000 CJ est. value
Wildwood, FL 32163

Freedom Fellowship Church Expansion
New Construction, Infrastructure - 19,000 SF
Conception
$6,200,000 CJ est. value
Wildwood, FL 34785

Oxford Cottages
New Construction, Infrastructure - 131,150 SF
Design
$36,000,000 CJ est. value
Oxford, FL 34484

South 19 Avenue Aparments
New Construction, Infrastructure - 13,120 SF
Design
$6,800,000 CJ est. value
Hollywood, FL 33020

Webster and Center Hill Utility Interconnect
Infrastructure
Bidding
$3,758,000 CJ est. value
Bushnell, FL 33513

Seco Head Quarters Call Center Shared Space Model Redesign
New Construction, Renovation, Infrastructure
Bidding
$1,000,000 CJ est. value
Sumterville, FL 33585

Sprouts Farmers Market #650 / The Villages
Demolition, New Construction, Infrastructure - 23,256 SF
Post-Bid
$6,200,000 CJ est. value
The Villages, FL 32162

RFQ Engineering - C-466 at C-475N Roundabout Safety Project
Infrastructure
Post-Bid
$500,000 CJ est. value
Wildwood, FL 34785

Directional Bores
Infrastructure
Results
Bushnell, FL

Asphalt Cut and Patch
Infrastructure
Results
The Villages, FL 32162

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Eden Villages
New Construction, Infrastructure
Construction
$36,800,000 CJ est. value
Wildwood, FL 34785

Sumter Villas
New Construction
Pending Verification
Bushnell, FL

UF Health Acute Care Hospital
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Wildwood, FL 34785

Upsizing SR44 Phase 2 - 001-802-536-3100 - Sumter County
Infrastructure
Conception
$1,973,000 CJ est. value
Bushnell, FL 33513

Last Updated 02/03/2023 10:35 AM
Project Title

Belvedere Golf Courses Renovations

Physical Address View project details and contacts
City, State (County) The Villages, FL 32162   (Sumter County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Golf Course, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,260,550 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Suppliers are to meet in the parking lot of: Churchill Greens, 534 Belvedere Blvd., The Villages, FL 32162 All questions received by 4:00 PM on January 20, 2023 will be considered. Questions will not be answered over the phone. Questions must be in writing and emailed to Susi Belon at Susan.Belon@Districtgov.org The Village Development District is requesting bids for the renovation of Belvedere Golf Courses (Churchill and Belmont). Qualified firms wishing to respond for ITB # 23B-004 Belvedere Golf Courses Renovations, must provide all labor, services, equipment and materials described in this document, whether directly or through sub-contractors/sub-consultants. This does not, however, limit the use of sub- contractors or subconsultants. The intent of this ITB is to procure a qualified, professional Supplier for the renovation of a golf course who has ten (10) years of experience with projects of similar size and scope. Supplier shall provide a "Turn Key" job. The intent of this project involves improvements and renovations to the Belvedere Golf Courses (Churchill Greens and Belmont). This project includes; but is not limited to, new greens, tees, fairways and re-grassing of the course. Work on this project will begin upon awarded Supplier's receipt of Notice to Proceed. Completion is expected within 180 calendar days after the date specified in the Notice to Proceed. The completion date may be extended due to unforeseen circumstances with the approval of the District. Successful Supplier will be responsible for all work according to the attached plans to include all materials, labor, and permitting required to complete the project in a timely and professional manner. Successful Supplier and any subcontractors will be required to attend a pre-construction meeting after the bid award is approved by the District and the Agreement has been executed by all parties. It is the intent of these specifications to describe a complete project fully acceptable to the District. Even though certain details may have been unintentionally omitted, the Supplier shall nonetheless perform all work necessary to complete the project to the highest industry standards and acceptable to the District. All materials and workmanship shall be first class and shall conform to the highest industry standards or the specifications, whichever requirements are more stringent. - Work hours are 7:00 am to 7:00 pm, seven (7) days per week. - Any grass and landscaping damaged at the project site by Supplier shall be repaired to District Standards. Supplier is responsible for all repairs of damage to District standards. - A staging site will be supplied for parking of equipment, workman parking, for storing materials and supplies and for debris containers. The staging site must be adequately protected from any potential damage caused by any of the aforementioned. - Stock pile location as defined at the on-site pre-bid conference. - All areas are to be kept safe for workers and residents. Supplier is responsible for initiating, maintaining and supervising all safety precautions in accordance with all safety laws and regulations at the project site. Appropriate construction signage with penalties for trespass of non-construction visitors are to be posted. - Supplier shall designate a safety representative at the project site for the prevention of accidents and the supervision of safety precautions and programs. - All property improvements and construction projects are to be in compliance with Title II of the Americans with Disabilities Act (ADA). - Supplier shall have all current local, state and federal licenses as required to perform the work. - Supplier shall be responsible for obtaining all permits, inspections, tests and/or approvals. - Supplier will be responsible for demolition, disposal, and construction to include all materials, labor, equipment, and permitting required to complete the project in a timely and professional manner. - The Supplier may subcontract certain procedures or operations with the written approval of the District Management. Proof of proper licensing and insurance to be provided upon request. The Supplier is held responsible for any work performed by any subcontractor engaged.

Details

Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Lockers, Flagpoles, Flags and Banners.
Division 22 - Plumbing, Facility Sanitary Sewerage, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Clearing and Grubbing, Earth Moving, Grading, Excavation and Fill.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting Irrigation, Planting Preparation, Turf and Grasses, Plants, Planting Accessories.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Utility Water Drains, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents