Similar Projects
BHTP Transmission Force Main Section 1 - Subaqueous Portion
New Construction
Bidding
Virginia Beach, VA

Nansemond Treatment Plant Advanced Nutrient Reduction Improvements Phase II(NP013820)
New Construction
Bidding
Suffolk, VA 23435

Secondary Clarifier Drive Repair - CETP
Post-Bid
Virginia Beach, VA

2020 Waterworks Improvements Phase II Project
Post-Bid
Radford, VA

Crozet Water Treatment Plant - Expansion and Rehabilitation
Results
$7,170,000 est. value
Charlottesville, VA

BRWRF 16.5 MGD Design Flow Expansion Project
Results
Ashburn, VA 20147

Shenandoah Valley Organic Packaging Plant Expansion
New Construction - 132,600 SF
Pending Verification
$10,000,000 CJ est. value
Harrisonburg, VA 22802

KMLWTP Chemical Pump Replacement
Alteration
Bidding
Norfolk, VA 23508

On Call Materials and Construction Related Testing Services
Term Contract
Post-Bid
Winchester, VA 22601

James River SWIFT Facility (GN016360) and James River Treatment Plant Advanced Nutrient Reduction Improvements (JR013400)
Results
$237,000,000 est. value
Newport News, VA 23602

Water Treatment Plant Substation 1 Replacement Project
New Construction
Bidding
Richmond, VA

Filter Media and Silica Sand Removal in Equalization Basin
Post-Bid
Norfolk, VA 23502

Lee Hall Water Treatment Plant (LHWTP) Filter Media Replacement
Results
Newport News, VA

Maintenance and Construction Services - Secondary Clarifiers
Renovation
Bidding
Richmond, VA 23231

Qualification of CMAR - Quarry A (Milestone Reservoir) and Raw Water Pumping Station
Post-Bid
VA

Last Updated 10/14/2021 04:24 PM
Project Title

Moores Bridges WTP Chemical and Facility Upgrades

Physical Address View project details and contacts
City, State (County) Norfolk, VA   (Norfolk City County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

This project will provide a new concrete chemical trench in the WTP yard that is sized correctly and organized with the piping it holds. The project will also provide a new separate access road and gate to the WTP. The new gate will reduce risk and provide flood mitigation access to the WTP.

Details

Water Treatment Plant, New Construction, 1 Water Treatment Plant, Approximately 6,091 SF Renovation.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents