Similar Projects
Washburn Rural Middle School Renovation
Renovation - 96,000 SF
Conception
$7,500,000 est. value
Topeka, KS 66619

South East Quincy Street from 8th Street to 10th Street - 601098 - City of Topeka
Infrastructure, Alteration
Conception
$950,000 est. value
Topeka, KS 66612

New Middle School
New Construction - 146,000 SF
Design
$46,500,000 est. value
Topeka, KS

Elementary School Additions & Renovations at 7 Sites
New Construction, Renovation - 112,000 SF
Design
$24,500,000 est. value
Topeka, KS

SW Jewell Avenue Water Main Replacement Project
Infrastructure
Bidding
$300,000 CJ est. value
Topeka, KS 66621

Sidewalk Improvement Project
Infrastructure
Bidding
$400,000 CJ est. value
Topeka, KS 66612

Silver Lake District Office Renovation
Renovation - 6,000 SF
Post-Bid
$1,000,000 to $3,000,000 est. value
Silver Lake, KS 66539

BRVB - Pavement Resurfacing and ADA Improvements
Infrastructure
Post-Bid
$100,000 CJ est. value
Topeka, KS 66612

Earthwork and Asphalt for Parking Lot and Drive at Fools Landing
Infrastructure
Results
Topeka, KS 66616

Street Repair Project - SW 57 th Street S. Topeka Blvd west to City Limits - Cold Mill & HMA Overlay
Infrastructure
Results
$98,791 CJ est. value
Topeka, KS 66609

Replacing the Bridge on SW 61st Street Over Six-Mile Creek
Demolition, New Construction, Infrastructure
Construction
$863,802 CJ est. value
Topeka, KS 66610

Southwest Auburn Road Solar Farm
Infrastructure
Construction
$10,000,000 CJ est. value
Topeka, KS 66610

Hill's Pet Nutrition Expansion / Project Prince
New Construction, Infrastructure
Pending Verification
$31,400,000 CJ est. value
Topeka, KS 66617

North Topeka Storage
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Topeka, KS 66608

Downtown Innovation Campus ( ASTRA Innovation Center )
New Construction, Infrastructure - 70,000 SF
Conception
$13,000,000 CJ est. value
Topeka, KS 66603

Last Updated 10/26/2022 02:05 PM
Project Title

USD 437 Shuler Education Center Bus Barn Addition

Physical Address View project details and contacts
City, State (County) Topeka, KS 66610   (Shawnee County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $331,900 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Auburn - Washburn USD 437 Topeka, KS, will receive sealed bids on a General Contract for construction, including electrical work, for the referenced project as described below. Complete construction of the project including Architectural, Structural, and MEP work to provide a two-story addition, the lower level being an addition to the existing bus driver's lounge, the second level being the addition of two staff offices. Bids shall be on a stipulated sum basis; segregated bids will not be accepted. Approximate area of building: 300 SF Addition Abbreviated written summary: Briefly and without force and effect on Contract Documents, work of Contract can be summarized as follows: 1) 2-story addition to existing bus barn bus driveraEUR(TM)s lounge and staff offices. 2) Interior Finishes: Painted CMU block, painted drywall, solid surface window sills, stained concrete floor, carpet tile, & walk-off-mat 3) Exterior Finishes: Prefinished metal panel, & aluminum storefront windows 4) HVAC Work: Ductless mini-splits in each new room, and unit heater in vestibule 5) Electrical Work: Interior & exterior light fixtures, & power receptacles.

Details

2 Stories Above Grade, 300 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents