Similar Projects
SMORE Trail Part II- Division Creek - C.8 - City of Big Bear Lake
Renovation, Alteration
Conception
$500,000 est. value
Big Bear City, CA 92314

Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Design
$275,000,000 CJ est. value
Redlands, CA 92373

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Design
$275,000,000 CJ est. value
Redlands, CA 92373

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

CA FTBL Dumont Dunes (1), Dumont Dunes Road
Infrastructure
Results
$2,000,000 to $5,000,000 est. value
CA

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

O'Reilly Auto Parts (CL3) #6229 / Colton
New Construction, Infrastructure - 7,319 SF
Construction
$2,000,000 CJ est. value
Colton, CA 92324

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Bartlett Public Parking Lot Lighting Upgrades - B.6 - City of Big Bear Lake
Infrastructure
Conception
Big Bear Lake, CA 92315

Amazon Warehouse Development / Central Avenue
New Construction, Infrastructure - 201,096 SF
Design
$22,000,000 CJ est. value
Upland, CA 91786

Asphalt Seal and Stripe - East Side
Infrastructure
Post-Bid
$300,000 CJ est. value
Victorville, CA 92395

Last Updated 10/13/2023 05:36 AM
Project Title

2022/2023 Ac Berm Curb Program

Physical Address View project details and contacts
City, State (County) Yucaipa, CA 92399   (San Bernardino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000330869 The contract work for this project shall consist of various items which include but are not limited to grinding/removal of existing AC curb and the construction/installation of new 8" AC berm curb. The new AC berm curb may be a depressed curb (for driveways) as directed by the City Engineer. The new AC curb shall be placed on a minimum 2" section of AC surfacing extending throughout the width of the curb, as noted on Modified Standard Plan 120-2 (Type D1). The contract work for the project will be completed per the processes and locations identified on the attached Appendix B, and the standard drawings in Appendix C. Bid Intent Not Available Question Acceptance Deadline 10/05/2023 12:00 PM PDT Questions are submitted online No

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents