Last Updated 04/16/2019 09:51 AM
Project Title

Harlem Valley Rail Trail, Phase IV,Village of Millerton and Town of North East, Dutchess County, Town of Ancram, Columbia County, New York

Physical Address View project details and contacts
City, State (County) Poughkeepsie, NY   (Dutchess County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Project involves the Construction of the proposed Harlem Valley Rail trail Phase IV, The shared-use trail begins at Main Street (Route 44) and continues Northerly for approximately 8.2 miles and stops at the under Mountain Road parking lot, trail crossings will be constructed at intersections with Main Street (Route 44), Beilke-State Line Road, Russ Pond Road, White House Crossing Road, Boston Corners Road and Under Mountain Road, Boardwalks will be constructed over wetland areas in segments 2, 3 & 4 to minimize impacts and a retaining wall will be constructed in segment 2 due to property constraints. This project includes five (5) bridge rehabilitations, one bridge replacement with a culvert pipe and one (1) culvert extension. This project also includes signing and striping on the proposed shared-use trail and roadway crossings. EEO Goals for this project are 6.4% Minority and 6.9% Female
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents