Similar Projects
Multi-User Silicon Carbide National Research Fabrication Laboratory (Music Lab)
New Construction
Conception
Fayetteville, AR

SOMO
New Construction, Build-Out
Design
Bentonville, AR 72712

Nanoscale Material Science and Engineering Building Clean Room Fit Out
Build-Out
Design
Fayetteville, AR

Construction of Judd Hill Farmers' Market
New Construction - 7,500 SF
Bidding
$1,000,000 to $5,000,000 CJ est. value
Jonesboro, AR 72467

UALR Central Campus Trojan Way and Ottenheimer Library Plaza Renovation
Renovation
Bidding
$5,400,000 est. value
Little Rock, AR 72204

Construction Management Services for the Nanoscale Material Science and Engineering Building Clean Room Fit Out
New Construction
Post-Bid
Fayetteville, AR

Doyne Renovation
Renovation
Post-Bid
Conway, AR

Job Order Contracting for Construction Services
New Construction
Results
Jonesboro, AR

UAPTC Stem Park Science Building Renovation
Renovation
Results
North Little Rock, AR 72118

University of Arkansas Institute for Integrative and Innovative Research - I3R Facility
New Construction - 144,000 SF
Design
$114,000,000 est. value
Fayetteville, AR 72701

Cooperative Extension Service Center
New Construction
Post-Bid
Newport, AR 72112

McWilliams House Restoration Phase 4
Renovation
Results
El Dorado, AR

Bud Walton Arena Renovation
Renovation
Design
$100,000,000 est. value
Fayetteville, AR

Construction Management Services for the HEERF ventilation improvements
Renovation
Post-Bid
Fayetteville, AR

General Contractors for Multi-User Silicon Carbide National Research Fabrication Laboratory (Music Lab)
Renovation
Post-Bid
Fayetteville, AR

Last Updated 02/08/2022 02:55 PM
Project Title

Fine Arts Center Restoration

Physical Address View project details and contacts
City, State (County) Fayetteville, AR 72701   (Washington County)
Category(s) Education, Entertainment/Recreation
Sub-Category(s) College/University, Convention/Exhibit Center
Contracting Method Competitive Bids.
Project Status Schematic Drawings, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value $38,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes full renewal of the exterior and the interior of the building, as well reconstruction of some lost site elements. The building envelope—including the original steel windows— will be restored according to its original design. In the interior, important public spaces like the lobby will be restored based on their original design, while other spaces will be sensitively renovated to better support their new uses. The lobby, which was subdivided some years ago to create a secure exhibition space, will be reopened and restored to its role as a pre-event space for the Stella Boyle Smith Concert Hall and the University Theater. The classroom wing, which now houses studios for the School of Art, will be reorganized for general-use classrooms as the studios are moved out of the center of campus to the Art and Design District. The concert hall and theater blocks will be renovated to address major acoustical, lighting, and mechanical problems, lack of back-of-house space, and other issues identified in a 2017 study1 in order to bring them in line with contemporary best practices. The landscape will be restored based on Tunnard’s original design, while making sensitive improvements for maintainability and ADA access.

Details

College/University, 81,000 SF Renovation, Convention/Exhibit Center, Renovation.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Loading Dock Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Site Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents