Similar Projects
Last Updated | 04/17/2023 05:11 PM |
Project Title | RFP D/B - Three Story Barracks |
Physical Address | View project details and contacts |
City, State (County) | Joint Base Lewis McChord, WA 98433 (Pierce County) |
Category(s) | Heavy and Highway, Outdoor Lighting, Residential, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Single-Family Homes, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Request for Proposals (RFPs), Construction start expected December 2023 , Request For Proposals |
Bids Due | View project details and contacts |
Estimated Value | $100,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Solicitation W912DW23R2001 - Three Story Barracks - JBLM, Washington This solicitation is a 100% Small Business Set - Aside. NAICS Code for this acquisition is 236220, Commercial and Institutional Building Construction, with a small business size standard of $39.5 million. Per DFARS 236.204(ii), the Magnitude of Construction for this project is between $25,000,000 and $100,000,000. The U.S. Army Corps of Engineers (USACE) Seattle District has a requirement to design and construct a new three - story, 150-person, barracks located at Joint Base Lewis McChord (JBLM), Washington. The primary facilities include living, sleeping quarters, baths, storage, services areas, information system, fire protection, alarm system, Energy Monitoring Control Systems (EMCS) connection, and cybersecurity measures. Supporting facilities includes Site development such as demolition, utility connections, electrical power, telecommunications, streetlights, pedestrian lights, site lighting, street paving, road improvements, parking, sidewalks, curbs and gutters, potable water, stormwater, wastewater, information systems, landscaping, signage and sport courts, heating and air conditioning will be provided by a self-contained system utilizing the base's available energy utilities. Comprehensive building and furnishing related interior design services are required. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||
Details | 3 Stories Above Grade, New Construction, New Construction.
|
||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |