Similar Projects
Reported | 06/20/2020 12:00 AM |
Project Title | Dewater Quarry |
Physical Address | View project details and contacts |
City, State (County) | Auburn, GA 30011 (Barrow County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Storm/Sewers |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Design-build-operate contractors to dewater storm water from an existing closed quarry pit located in Auburn Georgia. The project includes a floating Intake, 500 feet of 12-inch suc-tion pipe, engine driven pump, 1,200 feet of 12-inch force main, and storm water discharge into BMPs installed in the flood plain of Rock Creek. The contractor will present design calculations for the dewatering system. The project also include constructing a berm between mine process water and storm warter storage. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |