Similar Projects
I-285/I-20 West Interchange Project
Design
Atlanta, GA 31175

Unpaved Roads Phase 1
Infrastructure
Bidding
Atlanta, GA

State Route (SR) 400 Express Lanes P3 Project
Infrastructure
Bidding
$2,400,000,000 est. value
Atlanta, GA 31136

SR 400 Express Lanes
Post-Bid
Less than $13,000,000 est. value

Oakmulgee Ranger District Road Maintenance
Post-Bid
$2,500 to $5,000,000 est. value

Asphalt Rejuvenation Project
Results
$66,430 est. value
Milton, GA 30004

T32-D7-Pavepres-SR 139 6-9-111011
Results
GA

Rooms To Go Drive Addition
Alteration
Construction
$180,000 est. value
Atlanta, GA 30305

Milling, Inlay and Plant Mix Resurfacing on US 19/SR 3
Infrastructure
Bidding
$5,000,000 est. value
Atlanta, GA 30318

T32-D7-PCC-I85 I75 Split SB-119952
Infrastructure
Post-Bid
GA

T32-D7-PCC Spall Repair-113843
Results

Ramp 2 Pavement Replacement
Infrastructure
Bidding
$200,000 est. value
Atlanta, GA

I-285 Westbound Auxiliary Lane Extension
Infrastructure
Post-Bid
GA

2021 Road Patching Project
Results
Johns Creek, GA 30097

Conley Hills Replacement Elementary School - Grading and Erosion Control
Infrastructure
Bidding
$600,000 est. value
East Point, GA 30344

Reported 06/16/2022 12:52 PM
Project Title

Microsoft Data Center / Palmetto

Physical Address View project details and contacts
City, State (County) Palmetto, GA 30268   (Fulton County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Communication Building, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation.
Project Status Conceptual Design, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $27,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project location have not been released. As of April 25, 2022, the project is in planning stage. The Fulton County economic development officials have approved the project. Information regarding municipal approvals, the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Communication Building, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Audio-Visual Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture, Seating.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Communications Equipment Room Fittings, Communications Backbone Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents