Similar Projects
Last Updated | 07/24/2023 12:31 AM |
Project Title | Wolf Creek Power Plant Generator Stepup Unit (GSU) Transformer Replacement |
Physical Address | View project details and contacts |
City, State (County) | Jamestown, KY 42629 (Russell County) |
Category(s) | Single Trades |
Sub-Category(s) | Electric |
Contracting Method | Competitive Bids |
Project Status | Request for Qualifications, Construction start expected September 2023 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $20,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Amendment 0006 for W912P522R0013 Notice to Cancel Solicitation for: Wolf Creek Power Plant Generator Stepup Unit (GSU) Transformer Replacement, Jamestown, Kentucky Amendment 0004 - Purpose of the Amendment 1. Provide an update to Specifications2. Answer Questions and Answers from ProjNet 3. Update DFARS Clause 252.236-7001 and Contract Drawing and Specifications and FAR Provision 52.252-3 Alterations in the SolicitationPROJECT: Wolf Creek Pow er Plant Generator Stepup Unit (GSU) Transformer Replacement, Jamestown, Kentucky Project Description: This solicitation is to award one (1) construction contract for the Wolf Creek Power Plant Generator Step-up Unit (GSU) Transformer Replacement Project near Jamestown, Kentucky. The scope of this requirement is for the design, construction, delivery, and installation of three (3), three phase 13.2/161kV main GSU power transformers to replace the existing ten (10) single-phase GSU transformers at the Wolf Creek Power Plant. Disclosure of Magnitude of Construction Project: The estimated magnitude of this requirement is between $10,000,000 and $25,000,000. Availability of Plans (Drawings), Technical Specifications and Additional Documents: All drawings, technical specifications, and additional documents relating to this Request for Proposal (RFP) are available for download at this solicitation posting on the SAM website, www.SAM.gov. No printed copies of the aforementioned documents will be provided by the Government. Although provided as separate attachments, the following documents are considered an official part of the solicitation. Pre-Proposal Site Visit and Conference: Pursuant to the Pre-Solicitation Notice, a site visit was held on 9 December 2022 at Wolf Creek Power Plant near Jamestown, KY. **** A Pre-Proposal Conference will be held on 12 January 2023 at 1:00 pm Central Time via Webex to go over the Solicitation requirements. ***** Webex link and call-in information is included in the attached Solicitation FAR 52.236-27 Alt 1, Site Visit (Construction). Prospective Offerors' Questions and Requests for Information: Offerors should submit questions concerning this Solicitation through the Bidder Inquiry function in ProjNet at http://www.ProjNet.org/ProjNet. Solicitation Number: W912P522R0013 The Bidder Inquiry Key: QAJVY9-W98VU4 PROPOSAL SUBMISSION: ALL SUBMISSIONS TO THIS RFP SHALL BE SUBMITTED ELECTRONICALLY THROUGH via Procurement Integrated Enterprise Environment (PIEE) ***Technical Plans and Specifications were posted prior to the site visit. An amendment will be forthcoming*** The ability for prospective Offerors to enter questions in reference to the Solicitation will be disabled ten (10) calendar days prior to the closing date stated in the Solicitation. No Government responses will be entered into the ProjNet system within five (5) calendar days prior to the closing date stated in the Solicitat *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |