Similar Projects
Two Lane Resurfacing - MIA-SR 571/Main St Resurfacing
Bidding
Tipp City, OH 45371

2021 Paving Program
Bidding
$810,000 est. value
Troy, OH 45373

2020 Tipp City Resurfacing Project
Post-Bid
Tipp City, OH

Harrison-Atlantic Street Project
Results
Less than $710,075 est. value
Troy, OH 45373

Bellefontaine Road Resurfacing
Results
Less than $155,995 est. value
Troy, OH

Minor Widening - MIA-CR 25A-03.54
Bidding
Tipp, OH

County Road 25A Resurfacing
Results
Less than $480,235 est. value
Troy, OH

Furnish, Haul, Spread Various Gradations of Limestone on the Township Roads
Bidding

Two Lane Resurfacing - US-US 36-08.25
Results
OH

Street Resurfacing Program (2020)
Results
Less than $670,000 est. value
Piqua, OH 45356

2020 Covington Paving Program
Results
Less than $160,000 est. value
Covington, OH 45318

2020 Paving Program
Results
Less than $1,025,000 est. value
Troy, OH

High Street Area Pavement Improvements
Results
Less than $150,000 est. value
Bradford, OH

Scarbrough Drive Extension Project
Results
Less than $237,500 est. value
Piqua, OH

East Ash Street Pavement Repairs
Results
Less than $74,000 est. value
Piqua, OH 45356

Last Updated 02/04/2021 08:56 AM
Project Title

Riverside Drive Improvements Phase 3 and 4

Physical Address View project details and contacts
City, State (County) Troy, OH   (Miami County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,845,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project will reconstruct approximately 3,000 feet of Riverside Drive from Orchard Drive to the northern property line of the existing Duke Park. The project scope will include new curb and gutter from Orchard Drive north to the Duke Park entrance. North of the park entrance a more country profile will be used with side ditches instead of curb and gutter. A left turn lane will be added northbound at the entrance to Duke Park. The Duke Park exit will also be widened to accommodate dedicated left and right turn lanes. The existing 50+ year old six-inch (6”) water line will be replaced with a twelve-inch (12”) main and an eight-inch (8”) sanitary sewer line will be extended north to County- owned property at 1625 Troy-Sidney Road. Sidewalks will also be extended on the east side of the road to the Duke Park entrance with pedestrian crossings marked at Orchard Drive, Nottinghill Lane and the north side of the Duke Park entrance.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents