Similar Projects
Indefinite Delivery Contracts - HVAC Testing and Balancing Firms
Term Contract
Sub-Bidding
Taylors, SC 29687

Hilton Head MHC HVAC Replacement
Renovation
Sub-Bidding
$45,000 CJ est. value
Hilton Head Island, SC 29926

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Repair HVAC Dormitory Building 2405 and 2406
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

Repair HVAC Dormitory Building 2405 and 2406
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

Pee Dee Mental Health Center (MHC) Chiller and Boiler Replacement
Renovation
Construction
$312,859 CJ est. value
Florence, SC 29506

Colleton County MHC HVAC Replacement
Renovation
Sub-Bidding
$55,000 CJ est. value
Walterboro, SC 29488

Covid-19 HVAC Equipment Servicing
Post-Bid
Fort Mill, SC

Air Purification Units
Results
Kingstree, SC

HVAC Contractors - Weatherization Assistance Program
Renovation
Sub-Bidding
$2,000,000 CJ est. value
Charleston, SC 29401

Fresh Air and Exhaust System at Sandy Run K8 School
Post-Bid
Swansea, SC 29160

USC Upstate Smith Science Building Renovations
Results
$4,600,000 to $5,200,000 est. value
Spartanburg, SC 29303

MTC Accelerator Building HVAC Unit Replacement - Northeast Campus
Renovation
Sub-Bidding
$400,000 CJ est. value
Columbia, SC 29203

HVAC Contractors
Term Contract
Post-Bid

Last Updated 10/11/2022 05:05 PM
Project Title

Batesburg-Leesville High School Gymnasium Units HVAC Upgrades - Rebid

Physical Address View project details and contacts
City, State (County) Batesburg, SC 29006   (Lexington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project is to replace existing roof mounted heat pumps with new, remove existing ventilation fans/intake hoods, and provide new roof mounted heat pumps with heat recovery units. Contractor shall provide the demolition and removal of all materials, conduits, wiring, piping and appurtenances as indicated on the drawings, including A/C units, ductwork, and air handler as required and/or directed by Engineer. Disposal of all removed materials shall be included. The Owner shall reserve the right to retain all materials prior to removal from site. The existing facilities will be vacated during demolition and installation of equipment. All disruption to services shall be scheduled in advance with the Owner prior to start of construction. Contractor shall coordinate the availability of products and equipment on the site prior to any demolition or removal of service. Deadline for Questions: 09/29/22 by 12:00 pm EST SEALED BIDS, shall be accompanied by a Bid Bond or certified check in an amount of not less than five percent (5%) of the base bid pledging that the bidder will enter into a contract with the Owner for the terms stated in the bid. Both Performance Bond and Payment Bond will be required in an amount equal to 100 percent of the contract price. All bonds shall be a surety Licensed in the State of South Carolina with an A+ minimum rating or performance and financial strength of at least 5 times the contract amount, including add alternates. All bonds shall be accompanied by a power of attorney authorizing the attorney in fact to bind the surety and certified to include the date of the bond. Bids are due on date and time as noted and will be publicly opened at the stated time and place. Bids received after this time will not be considered. You or a representative of your firm are invited to attend No bid may be withdrawn for a period of 60 days after date and time of opening of bids. Substantial completion of this project is July 1, 2023. Liquidated damages in the amount of $500.00 per day will be charged this contract for each day beyond the substantial completion date Demolition: Contractor shall provide the demolition and removal of all materials, conduits, wiring, piping and appurtenances as indicated on the drawings, including A/C units, ductwork, and air handler as required and/or directed by Engineer. Disposal of all removed materials shall be included. The Owner shall reserve the right to retain all materials prior to removal from site.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents