Similar Projects
2022 Private Lead Service Line Replacements Grigg and Scheffer Phase II Project
Infrastructure
Bidding
$400,000 est. value
Saint Paul, MN 55116

2022 Lead Water Service Line Replacement Project Metro Gold Line BRT
Infrastructure
Bidding
$400,000 est. value
Saint Paul, MN 55130

North Smoky Hills Graveling
Renovation
Post-Bid

AO Smith Btr500 120 Natural Gas Water Heater
Post-Bid
MN

Citywide Sewer Lining
Results
Saint Paul, MN

2021 Street and Utility Improvement & 29th Avenue and Saint Anthony Boulevard Mill and Overlay
Results
Saint Paul, MN 55100

2022 Bituminous Seal Coating Project
Infrastructure
Bidding
$100,000 est. value
White Bear Lake, MN

Site 1408-1410 Paving
Renovation
Post-Bid
Saint Paul, MN 55117

Falcon Heights Pavement Management
Results
Falcon Heights, MN

Maple Hills Stormwater Forcemain and Parkway Drive Improvements
Infrastructure
Bidding
$2,000,000 est. value
Maplewood, MN

Lexington Avenue between County Road E to I-694 Reconstruction
Infrastructure
Post-Bid
Saint Paul, MN 55130

Metro-Wide Traffic Control and Flood Sealing for Bridge Numbers 19095, 27624G, 27210, 9195, 27078, 27V59, 27517, 27526, 27654, 27265, 27R21, 9860, and 82527
Results

2022 Joint and Crack Sealing Project
Infrastructure
Bidding
$160,000 est. value
White Bear Lake, MN

County Road B2 and Lexington Road Improvements
Infrastructure
Post-Bid
MN

Grading, Bituminous Surfacing, Signing, TMS, and Lighting
Results

Last Updated 06/23/2022 08:44 AM
Project Title

Prior Avenue Reconstruction 2022 Project

Physical Address View project details and contacts
City, State (County) Saint Paul, MN 55104   (Ramsey County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $800,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruct Prior Avenue from Gilbert to University Ave. Includes paving and base, pedestrian improvements, infiltration trench, water and sewer utilities.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents