Similar Projects
FG Power Plant Parking Lot Retaining Wall
Term Contract
Design
Dutch John, UT

370 East Street Reconstruction
Infrastructure
Bidding
$1,000,000 est. value
Salt Lake City, UT 84107

1300 North Reconstruction - Main Street to 1285 West
Infrastructure
Bidding
$4,200,000 est. value
Clinton, UT 84015

650 S Construction Trax Platform
Post-Bid
$1,750,000 to $2,000,000 est. value
Salt Lake City, UT

Panguitch High School South Parking Lot Improvement Package
Post-Bid
Panguitch, UT 84759

Parking Structure Demolition and New Construction
Demolition
Results
Ogden, UT

Seal Coat Vernal, Ut Parking Lot
Results
Less than $25,000 est. value
Vernal, UT 84078

DFCM Construction - Pre Qualified Site and Civil and Paving
Infrastructure
Bidding
$400,000 est. value
Taylorsville, UT 84129

300 East - 3900 South to 3970 South
Post-Bid
Millcreek, UT

Layton Sidewalk Improvements
Results
Less than $100,000 est. value
Layton, UT 84040

Pre-Qualified Contractors for Construction - Related - SOJO
Infrastructure
Bidding
South Jordan, UT

BRHS Natatorium Parking Lot Expansion
Post-Bid
Brigham City, Garland, Tremonton, UT 84312

2020 Green River City Curb and Gutter and Sidewalk Project
Results
Green River, UT

USU Water Lab Bridge Deck and Parking Lot Replacement
Renovation, Infrastructure
Bidding
$500,000 est. value
Logan, UT 84321

Bear River High School CTE Shop Asphalt Replacement
Post-Bid
Brigham City, Garland, UT 84312

Reported 05/12/2022 12:00 AM
Project Title

Installation and Construction of Sidewalk

Physical Address View project details and contacts
City, State (County) Huntington, UT   (Emery County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a sidewalk / parking lot in Huntington, Utah. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot. Huntington City is accepting proposals from a Properly Licensed Utah Contractors for the installation and construction of approximately 3,150 linear feet of sidewalk. This project is located within Huntington City, in Huntington, Utah. The sidewalk project consists of the following: 1. Site Preparation 2. Form, pour, and finish 60" wide by 4" thick concrete sidewalks with contraction joints and expansion joints. A bid bond in the amount of five percent (5%) of the proposed amount will be required. This bond will be made payable to Huntington City and shall accompany the proposal. Interested parties can contact Huntington City (435-687-2436) during regular business hours for a spec sheet. Huntington City reserves the right to reject any or all proposals or to waive any formality or technicality in any proposal in the interest of the city.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents