Project Title | J.M. Tate High School Stadium Repairs |
Physical Address | View project details and contacts |
City, State (County) | Cantonment, FL 32533 (Escambia County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Stadium |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $200,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work includes concrete and masonry repair of the existing home and visitors football stadium seating at Tate High School in Cantonment, Florida as detailed on the drawings and as follows: 1. Repair of ten existing visitor stadium CMU walls includes removal of some face shells, grouting cells of existing CMU walls in two phases, clean, prep, & coat visitors stadium existing CMU walls 2. Removal and replacement of existing visitor’s stadium precast double tee end caps with repair mortar 3. Repair of exposed reinforcing steel in top surface of existing visitor’s stadium precast double tees. 4. Repair of exposed reinforcing in bottom surface of existing visitor’s stadium precast double tees. 5. Clean underside of existing visitor’s stadium precast double tee seating. 6. Extend guard rail up to 42” high with chain link fencing along perimeter of existing visitors stadium seating. 7. Repair of cracks, spalls, and old delaminating patches on existing home stadium precast beams with epoxy injection & repair mortar. 8. Repair of bolted connections between existing home stadium precast beams and columns. 9. Repoint mortar at four home side stadium existing CMU walls. 10. Demolish and remove one leaning existing CMU wall. 11. Clean, prep, & coat home stadium existing CMU walls. 12. Clean, prep, & coat home stadium exposed steel weld plates (bid alternate) D. The Work will be constructed under a single prime contract. E. The Project Schedule is as follows: 1. Anticipated Notice to Proceed date: March 1, 2021 2. Anticipated Substantial Completion date: June 28, 2021 3. Anticipated Final Completion date: July 28, 2021 |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |