Similar Projects
Yorkfield Detention Basin Wall Detention Basin Wall Repairs - City of Elmhurst
Infrastructure
Conception
$250,000 est. value
Elmhurst, IL

Public Work Phase III and Other Improvements - City of Elmhurst
Renovation, Alteration
Conception
$2,475,000 est. value
Elmhurst, IL 60126

Blanchard Circle Mixed Use Buildings
New Construction, Infrastructure - 16,400 SF
Design
$4,000,000 CJ est. value
Wheaton, IL 60189

Poplar Creek Church Bartlett
New Construction, Infrastructure
Design
$1,800,000 CJ est. value
Bartlett, IL 60103

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Building Demolition and Site Restoration
Demolition
Post-Bid
West Chicago, IL 60185

Co-Op Park Site Improvements
Results
Glen Ellyn, IL 60137

Water Main Lining
Results
$496,793 est. value
Glendale Heights, IL

Dash Downers Grove Apartments
New Construction, Infrastructure
Construction
$40,000,000 CJ est. value
Downers Grove, IL 60515

Tri-State Tollway (I-294) Roadway and Bridge Reconstruction
Infrastructure
Construction
$205,907,075 CJ est. value
Hinsdale, IL 60521

Lexington Trace Parcel Unit 3 Townhomes
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Naperville, IL 60540

Lexington Trace Parcel Unit 3 Townhomes
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Naperville, IL 60540

Fire Station #13 - C012 - City of Aurora
New Construction, Infrastructure
Conception
$6,500,000 CJ est. value
Aurora, IL 60502

2021-2024 Fire Hydrant Flow Testing Services
Term Contract
Post-Bid
Bensenville, IL

San Souci Water Main Improvements
Alteration
Results
Aurora, IL

Last Updated 11/29/2022 05:36 PM
Project Title

Washington Street Sanitary Lateral Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Naperville, IL 60540   (DuPage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $273,130 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Naperville is accepting sealed bids from qualified vendors to supply labor, equipment, supplies and material associated with the Washington Street Sanitary Lateral Rehabilitation Project. The work generally includes the rehabilitation of approximately seventeen (17) existing sanitary sewer service laterals by utilizing the installation of cured in-place pipe (CIPP). This bid also includes installation of approximately eleven (11) Vac-A-Tee cleanouts and the installation of nine (9) CIPP spot liners to cover abandon laterals. All questions concerning this bid shall be submitted in writing at least five business days prior to the online bid opening to NAME at GayleS@naperville.il.us. The deadline for questions is THURSDAY, SEPTEMBER 29, 2022 by 12:00 p.m. It is the intent of this specification to provide for the rehabilitation of approximately seventeen (17) existing sanitary sewer service laterals by the installation of cured-inplace pipe (CIPP). Some of these laterals will have "Shorty" liners and some will have full length liners installed. Please refer to project maps (Attachment 1) and list of locations (Attachment 2). 2. This bid includes installation of approximately eleven (11) Vac-A-Tee cleanouts (Attachment 2). 3. This bid includes installation of approximately nine (9) LMK "CAP-A CONNECTIONS" CIPP Spot liners (Attachment 3). 4. This bid includes the potential of approximately fifteen (15) tee liner diameter transitions. 5. This bid includes the potential of approximately four (4) service laterals to be re-cut opening in existing CIPP main liner. 6. All work shall be in accordance with the instructions and recommended procedures of the product manufacturers. 7. It is the intent of the City to exercise control over the sequence of work. The contractor will be assigned batches of service laterals to be completed in the assigned order. These laterals will be geographically grouped so as to enable efficient operations with minimal travel between jobsites

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents