Similar Projects
WTP #5
New Construction
Conception
$12,228,914 est. value
Buckeye, AZ

WTF #9
New Construction
Conception
$6,190,000 est. value
Buckeye, AZ

Clarifier Maintenance and Repair Services
Renovation
Bidding
Mesa, AZ

Water Treatment Plants JOC Engineering Support Services
Renovation
Bidding
$37,500,000 est. value
Phoenix, AZ

Vistancia Pump Station Conversion - Zone 5/6 To Zone 6/7
Post-Bid
Scottsdale, AZ 85383

Recoat Discharge Tubes at Mark Wilmer Pumping Plant
Renovation
Post-Bid
Phoenix, AZ

Waste Water Treatment
Results
Luke Air Force Base, AZ 85309

Neely WRP Facility Rehabilitation
Results
Gilbert, AZ 85233

Vistancia Boulevard - Sewer Lift Station I-1
Construction
Peoria, AZ 85383

Tempe Campus Central Utility Plant
New Construction
Conception
Tempe, AZ 85281

Arsenic Filter Media Replacement for Luke AFB
Post-Bid
Luke Air Force Base, AZ

Design-Build Services For Waddell Pumping Plant Plc-5 Replacement Project
Results
Less than $3,150,000 est. value
Phoenix, AZ

Storm Water Pump Lift
Term Contract
Post-Bid
Phoenix, AZ 85012

Luke Air Force Base Lift Station Construction Manager at Risk Services
Results
$3,000,000 est. value
Glendale, AZ 85301

Construction Manager at Risk Well Head Treatment Project-Well 7 Project
Alteration
Post-Bid
$7,000,000 est. value
Tempe, AZ

Last Updated 12/15/2021 04:32 PM
Project Title

Deer Valley Water Treatment Plant Finished Water Pump Station and Chemical Facility Rehabilitation and Refurbishment Construction Manager at Risk Services

Physical Address View project details and contacts
City, State (County) Phoenix, AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $30,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide preconstruction services and complete construction services for the Deer Valley Water Treatment Plant (DVWTP) Finished Water Pump (FWP) and Chemical Facility Rehabilitation and Refurbishment Construction Manager at Risk (CMAR) project. Pre-Qualification Meeting: Pre-Qualification Meeting on 10/19/2021 at 2:00 PM via WebEx. link https://cityofphoenix.webex.com/cityofphoenix/j.php?MTID=m60e5d684baabb23d4b5f6f58782f2afe, Join by meeting number Meeting number (access code): 2466 434 2781, Meeting, password: nqERa5JSK38. Join from a video system or application Dial 24664342781@cityofphoenix.webex.com You can also dial 173.243.2.68 and enter your meeting number Dial 24664342781.cityofphoenix@lync.webex.com.

Details

Water Treatment Plant, New Construction.
Division 02 - Existing Conditions, Geotechnical Investigations, Subsurface Drilling and Sampling.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment, Lifts, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Air Terminal Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Conveyors, Cranes and Hoists.
Division 44 - Pollution and Waste Control Equipment, Odor Treatment Equipment, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment, Common Work Results for Water and Wastewater Equipment, Water and Wastewater Preliminary Treatment Equipment, Water and Wastewater Chemical Feed Equipment, Water and Wastewater Clarification and Mixing Equipment, Water and Wastewater Secondary Treatment Equipment, Water and Wastewater Advanced Treatment Equipment, Water and Wastewater Residuals Handling and Treatment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents