Similar Projects
Nugent Park Playground Replacement - City of Umatilla
Renovation, Infrastructure
Conception
$576,000 CJ est. value
Umatilla, OR 97882

Umatilla Marina & RV Park Improvements - Design Phase - City of Umatilla
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Umatilla, OR 97882

US 730/4.4 Miles N of Oregon Border - Rockfall Prevention
Infrastructure
Design
$2,721,000 CJ est. value
McNary, OR 97882

US 730/4.4 Miles N of Oregon Border - Rockfall Prevention
Infrastructure
Design
$2,721,000 CJ est. value
McNary, OR 97882

North Hermiston Drain Piping - 2023
Infrastructure
Bidding
$175,000 CJ est. value
Hermiston, OR 97838

North Hermiston Drain Piping - 2023
Infrastructure
Bidding
$175,000 CJ est. value
Hermiston, OR 97838

Pendleton Signal Upgrade Project Phase II
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Pendleton, OR 97801

Pendleton Signal Upgrade Project Phase II
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Pendleton, OR 97801

Pedestrian Bridge and Utilities Replacement
Infrastructure
Results
$300,000 est. value
Umatilla, OR

Regional Water System Improvements Phase 1 - 2023
Renovation, Infrastructure
Results
$2,808,813 CJ est. value
Hermiston, OR 97838

South Hill Commons - New Multi-family Affordable Housing Project
New Construction, Infrastructure - 172,202 SF
Construction
$47,000,000 CJ est. value
Pendleton, OR 97801

Sterling Ridge Apartments
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Hermiston, OR 97838

Horizon Project
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hermiston, OR 97838

Eastern Oregon variable message signs
Infrastructure
Design
$1,069,175 CJ est. value
Pendleton, OR 97801

RFQ Contractor - McNary Dam Navigation Lock Crane Replacement
Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Umatilla, OR 97882

Last Updated 10/16/2023 07:34 AM
Project Title

Regional Water System Phase 2 Pipeline Improvements - 2024

Physical Address View project details and contacts
City, State (County) Hermiston, OR 97838   (Umatilla County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $8,500,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work for this Project includes, but is not limited to, the installation of approximately 13,750 linear feet (LF) of 30-inch ductile iron water pipe with two separate jack and bore railroad crossings and a canal crossing, an additive alternate for 8,500 LF of 18-inch polyvinyl chloride industrial wastewater line and 2,250 LF of 8-inch pressure sewer line with two separate jack and bore railroad crossings, and 12,000 square yards of surface restoration. A pre-bid conference will not be held for this Project. The Project has an expected duration of 270 days. Est. Value Notes:Base Bid - $8,000,000 to $8,500,000; Additive Alternative - $3,000,000 to $3,500,000 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.Question Deadline 10/17/2023 7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents