Similar Projects
Service Street
New Construction, Infrastructure
Conception
Thornton, CO

2022 Concrete Catch-Up Program
Infrastructure
Bidding
$2,000,000 est. value
Centennial, CO

I-70 Picadilly Design Build
Infrastructure
Bidding
Aurora, CO 80040

Quebec Highlands Infrastructure
Infrastructure
Sub-Bidding
Thornton, CO 80602

NIWOT Sanitation District Office and Entry Asphalt Replacement Improvements
Post-Bid
Niwot, CO 80504

Sport Court Resurfacing
Term Contract
Post-Bid
Thornton, CO

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

County Line Road Improvement Project
Results
Less than $2,000,000 est. value
Longmont, CO 80501

2022 Pavement Preservation Program
Infrastructure
Bidding
$2,000,000 est. value
Centennial, CO

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Design-Build Services I-70/Picadilly Interchange
Results
$37,000,000 to $43,000,000 est. value
Aurora, CO 80012

Gateway Center Filing 7 Phases 1 and 2
Post-Bid
Denver, CO 80239

Southeast Industrial Offsite Roadway Public Infrastructure Improvements Project
Results
Broomfield, CO 80537

Asphalt Repair FCI Englewood
Term Contract
Post-Bid
Littleton, CO

30th and Colorado Underpass
Results
Less than $10,000,000 est. value
Boulder, CO 80301

Last Updated 05/06/2022 06:40 AM
Project Title

North Pagosa Boulevard Resurfacing (Station 9+00 to 52+25)

Physical Address View project details and contacts
City, State (County) CO   (Archuleta County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,410,199
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of resurfacing an existing asphalt roadway being approximately 0.82 miles of North Pagosa Boulevard from the intersection with Bastille Drive to the recent reconstructed segment at the intersection of Lakeside Drive. One stretch of the road (+ 800 l.f.) will be widened to accommodate a center turning lane between Bastille Drive and Park Avenue. The remainder of the project generally maintains the existing horizontal and vertical alignments. Where the existing alignment is maintained, the project mostly consists of asphalt and subgrade pulverization, gravel supplementation, reshaping, and compacting the existing gravel roadway prior to placement of the asphalt surface.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents