Similar Projects
Klumpp Planned Unit Development
New Construction
Conception
Fairhope, AL 36532

Woodling Mixed Use Building
New Construction
Conception
Troy, AL 36081

Ulta Beauty at Target #2796
Renovation - 1,000 SF
Design
Homewood, AL 35209

Ulta Beauty at Target #2503
Renovation - 1,000 SF
Design
Hoover, AL 35226

Raceway #1528 / Foley
New Construction, Infrastructure - 3,680 SF
Bidding
$925,000 CJ est. value
Foley, AL 36535

T-Mobile #6000 (RMC) / Decatur
Demolition, Build-out - 4,322 SF
Bidding
$165,000 CJ est. value
Decatur, AL 35603

Walmart Supercenter #5197-606 - CAPXREF-3
Renovation
Post-Bid
Huntsville, AL 35763

Walmart Supercenter #298-605 - CAPXREF-1
Renovation
Post-Bid
Boaz, AL 35957

The Village at Meadowbrook f/k/a Mitchell Center
New Construction - 15,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Hoover, AL

Walmart Supercenter #1481-235 - ENTERTAINMENT OPTIMIZATION
Renovation - 182,484 SF
Construction
Homewood, AL 35209

The Village at Town Madison - Phase II
New Construction - 46,625 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
AL

Target
New Construction, Renovation - 19,200 SF
Pending Verification
Auburn, AL 36830

1922 2nd Avenue South
New Construction
Conception
$200,000,000 est. value
Birmingham, AL 35233

Ulta Beauty at Target #2276
Renovation - 1,000 SF
Design
Alabaster, AL 35007

Raceway #1532 / Moulton
New Construction, Infrastructure - 3,705 SF
Bidding
$980,000 CJ est. value
Moulton, AL 35650

Last Updated 09/13/2022 10:25 AM
Project Title

Ulta #311 - Midtown Village / Tuscaloosa

Physical Address View project details and contacts
City, State (County) Northport, AL 35476   (Tuscaloosa County)
Category(s) Commercial
Sub-Category(s) Retail
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

*This is a nighttime three phase remodel. As of September 13, 2022, a general contractor has been selected. A building permit has been approved and is awaiting pickup. *This project has been awarded and all trades have been let.

Details

1 Story Above Grade, 9,302 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents