Similar Projects
Jan Road Levee Setback Construction
Infrastructure
Bidding
$9,000,000 est. value
WA

Fall City Floodplain Restoration Planting
Alteration
Bidding
$1,000,000 est. value
WA

Engineering Services for McSorley Creek Shoreline & Estuary Restoration Project
Renovation, Alteration
Post-Bid
$950,000 est. value
Des Moines, WA 98198

Geosynthetic and Erosion Control
Infrastructure
Post-Bid
WA

2021 Horse Creek Streambed Repairs Project
Infrastructure
Results
$90,000 to $100,000 est. value
Bothell, WA 98011

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

I-90, SR 161, SR 202 and SR 203 - Fish Passage
Infrastructure
Bidding
$165,000,000 to $180,000,000 est. value
WA

Lummi Nation Seapond Dike Repair and Armoring
Infrastructure
Post-Bid
Bellingham, WA

Storm Renewal and Replacement Project
Infrastructure
Results
$620,000 to $650,000 est. value
Auburn, WA 98092

SOOS Creek Hatchery Water Supply Treatment Supplemental Information
Infrastructure
Bidding
$2,500,000 est. value
Auburn, WA 98092

Melrose I-5 Drain Crossing Rehabilitation
Alteration
Post-Bid
Seattle, WA

2442 WLSP Sinkhole Lake Restoration
Infrastructure
Results
$276,650 est. value
Bellevue, WA 98008

Permitting Services, Goodman Creek Culvert Replacement
Term Contract
Bidding

Riverbend Levee Setback and Floodplain Restoration Phase Two
Infrastructure
Post-Bid
$9,222,000 est. value
Renton, WA 98058

Eastrail North Segment Tie Removal and Interim Trail Phase 2
Infrastructure
Results
$1,280,212 est. value
Kirkland, Woodinville, WA

Reported 04/14/2022 12:00 AM
Project Title

Holly Street Campus Creek Bank Repair

Physical Address View project details and contacts
City, State (County) Issaquah, WA 98027   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,000,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing temporary stream bank structure and construct a permanent bio-engineered structure for stream bank stabilization. This work will occur during the 2022 WDWF fish window in Issaquah Creek.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents