Similar Projects
Skiff Point
New Construction
Design
Clearwater, FL 33767

Neighborhood Sidewalk and ADA Ramp Program FY18
Infrastructure
Bidding
Saint Petersburg, FL 33703

District Seven FCO Structures and Sidewalk Project
Post-Bid
Less than $261,000 est. value
Clearwater, FL 33760

Concrete, Brick and Mortar Repair and Replacement
Term Contract
Post-Bid
Saint Pete Beach, FL 33706

West Bay Drive/Pinellas Trail Gateway
Results
Less than $1,802,333 est. value
Largo, FL

Alt US 19 / SR 595 at Wilson Street Pedestrian Crosswalk
Results
Less than $80,000 est. value
Dunedin, FL 34698

46th Avenue Recreational Trail
Post-Bid
$561,393 to $562,923 est. value
Kenneth City, FL

Merry Pier Restoration
Results
$1,000,000 est. value
Saint Pete Beach, FL 33706

Saratoga Apartments Outer Parking Lots Renovations
Post-Bid
Saint Petersburg, FL 33713

M&R Waterfront U.S. Coast Guard Station Sand Key, FL
Results
$1,000,000 to $5,000,000 est. value
Clearwater Beach, FL

St. Petersburg College Board of Trustees Clearwater Campus Parking Lot Repairs
Post-Bid
Clearwater, FL 33755

Waterfront Park Observation Boardwalk Project
Results
$339,000 est. value
Seminole, FL 33772

Structure Tops R and R North County Sugar Bear Trail
Infrastructure
Post-Bid
$876,892 est. value
Clearwater, FL

Lakeview Road ADA Ramps and Drainage Improvements
Results
Less than $1,572,017 est. value
Clearwater, FL 33756

Infrastructure, Streetscape, and Park Improvements to the 22nd Street South Corridor
Infrastructure
Post-Bid
Saint Petersburg, FL

Reported 12/08/2021 03:38 PM
Project Title

Construction of The New Boardwalk and Dock at The St. Petersburg College Campus in Bay Pines

Physical Address View project details and contacts
City, State (County) Madeira Beach, FL 33708   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of miscellaneous site demolition and grading. New sidewalks. New Wood Boardwalk and the demolition of the old and the construction of a new dock. In addition to the Boardwalk there is a Habitat Restoration Project, including new oyster beds and habitat restoration

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents