Similar Projects
RFP - Specialty Field Support, Analysis, Engineering Services
Term Contract
Conception
San Diego, CA 92101

RFP Engineering - Traffic Control Design Services for Replacing Valves on the Ramona Pipeline
Infrastructure
Bidding
$200,000 CJ est. value
San Diego, CA 92101

RFP - Housing Element Update - Site Selection
Term Contract
Bidding
Encinitas, CA 92024

RFQ - Comprehensive Long-Term Environmental Action navy (C.L.E.A.N.) V Indefinite Delivery/Indefinite Quantity contract for Architect-Engineer (A-E) services
Term Contract
Post-Bid
$240,000,000 CJ est. value
San Diego, CA 92132

A-E IDIQ Surveying and Mapping
New Construction, Term Contract
Post-Bid
$10,000,000 est. value

Yearly Service for Critical Water Samples
Term Contract
Results
San Diego, Twentynine Palms, CA 92134

San Diego County Water Authority POW-5 Turnout and Flow Control Facility Project - WT040
New Construction, Infrastructure
Results
$4,800,000 to $6,480,000 est. value
Poway, CA 92064

RFP Engineering - Professional Services for El Corazon Park Site 1 Design
Infrastructure
Pending Verification
$200,000 CJ est. value
Oceanside, CA 92056

RFP - As-Needed Cultural Resources Consultant - Contracts 1 and 2
Term Contract
Bidding
San Diego, CA 92101

RFQ - Architect-engineer Indefinite Delivery/indefinite Quantity Contract for Cercla/rcra Environmental Engineering Support
Term Contract
Post-Bid
$95,000,000 CJ est. value
San Diego, CA 92101

FAA Airport Traffic Control Tower Design Competition
New Construction
Results

RFP - Housing Element Update
Term Contract
Bidding
Encinitas, CA 92024

Cultural and Environmental MATOC
Term Contract
Post-Bid

RFP For Engineering Services For Regional Brackish Water Program - Phase 1 Pilot
Term Contract
Results
San Diego, CA

RFP Design - Design of Storm Water Pump Station D Component Upgrade
Renovation, Infrastructure
Bidding
$2,200,000 CJ est. value
San Diego, CA 92110

Last Updated 05/01/2023 01:03 PM
Project Title

RFP Engineering - Professional Construction Management Services for Heritage Bridge Improvements

Physical Address View project details and contacts
City, State (County) Chula Vista, CA 91913   (San Diego County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Schematic Drawings, Construction start expected March 2024 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $30,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of May 1, 2023, the project is in design. A civil engineer has been selected. The project is anticipated to be advertised for construction bids at the end of 2023 and start construction in the first quarter of 2024. Bid Bond 0.00% Payment Bond 0.00% Performance Bond 0.00% Pre-Bid Meeting No Online Q&A Online Q&A No Consultant shall provide professional engineering services to perform Resident Engineering and construction inspection, embodying the necessary qualifications and experience including licensing as a Professional Civil Engineer in the State of California, and shall provide appropriate equipment such as vehicles, personal computers, camera, tools, and personal safety equipment to perform this work. The method of Contractor Selection has not been Determined at this time. The estimated schedule for the selection process is as follows: Aug 19, 2022 (Friday) ...................................................................... Advertise Date Sep 30, 2022 (Friday) ...................................................................... Proposals due Oct 2022 ..................................................................... Notify Shortlisted Proposers Oct 2022 ......................................................... Interviews for Shortlisted Proposers Oct 2022 ....................... Highest-ranking Proposer notified and negotiations begin Dec 2022 ........................................................... Award of Contract by City Council Feb 2023 .................................................................................... Notice to Proceed Dec 2022 ....................................... Anticipated Bridge Improvements Construction ............................................................................... Contract Advertise Date Feb 2023 ................................ Bridge Improvements Construction Contract Award Jul 2023 ................................................... Bridge Improvements Construction Start Feb 2025 ......................................... Bridge Improvements Construction Complete Feb 2026 .................................................................... Plant Establishment Period

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents