Similar Projects
Wacker and Oakton Lift Station Upgrades
Renovation
Design
Savanna, IL

Canal Road Pump Stations No. 2 & No. 3 At Wood River Levee District
Renovation
Design
$1,000,000 to $5,000,000 est. value
Roxana, IL

Wastewater Treatment Facility
New Construction, Infrastructure
Bidding
Summerfield, IL 62254

Jackson Creek Lift Station Improvements
Renovation
Bidding
Frankfort, IL

Low Lift Pump
Post-Bid
Winnetka, IL

Mount Prospect Golf Club Irrigation Pump Station Replacement
Post-Bid
Mount Prospect, IL 60056

Crowe, Elk and Stewart Street Lift Station Improvements
Results
Less than $1,100,000 est. value
Geneseo, IL 61254

Pump Station Repairs at the Venice Deep Wells
Results
Venice, IL

7th Avenue Pump Station
Construction
Less than $1,250,000 est. value
Mendota, IL 61342

Maintenance, and Repair Services for the Chicago Tunnel Systems and Pump Stations
Renovation
Bidding
Chicago, IL

Check Valve Replacement
Renovation
Post-Bid
Gurnee, IL 60031

WWTP and 10th Street Pump Station Improvements
Results
Less than $530,000 est. value
Cairo, IL 62914

Lake Opeka Storm Water Pump Station
Renovation
Bidding
Des Plaines, IL

High Lift Pump 7 Replacement
Renovation
Post-Bid
Northbrook, IL

Lift Station No. 14 Replacement
Renovation
Results
Less than $2,000,000 est. value
Mount Vernon, IL 62864

Last Updated 03/22/2022 08:28 AM
Project Title

Cedar Lake Road Pumping Station Remodel

Physical Address View project details and contacts
City, State (County) Round Lake, IL   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $575,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed construction consists of the remodeling of the Cedar Lake Road Pumping Station, including replacement of existing 25 Hp triplex wastewater pumps with the same capacity pumps, submersible pump level controller, pump control panel, and natural gas generator. The Project will include coordination of a new 480v electric service, natural gas service, and other miscellaneous items of work

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents