Similar Projects
City Wide HVAC Maintenance and Repairs
Alteration
Bidding
Savannah, GA

Purchase and Installation of Outside Air System
Alteration
Bidding
Savannah, GA 31405

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

West Chatham Middle School Gym Roof Top Unit (RTU) Replacement
Results
Pooler, GA 31322

HVAC Installation, Maintenance and Repair Labor Services
Term Contract
Results
Savannah, GA 31401

Fort Stewart Range Hood
Term Contract
Bidding
Fort Stewart, Savannah, GA 31409

Annual Contract for Chiller and Cooling Tower Preventative Maintenance and Repair Services
Term Contract
Post-Bid
GA

HVAC Equipment Annual Contract
Term Contract
Results
Savannah, GA 31401

Annual HVAC Preventative Maintenance Program
Alteration
Post-Bid
Garden City, Pooler, Savannah, Tybee Island, GA 31401

(ESPLOT) STEM Academy at Bartlett Cooling Tower Replacement
Results
Savannah, GA 31406

On-Call HVAC Maintenance and Repair Services
Alteration
Post-Bid
Savannah, GA

Air Management System Maintenance
Term Contract
Results
Savannah, GA

Purchase of Gas-Fired Unit Heaters
Alteration
Post-Bid
GA

Annual Contract for HVAC Maintenance at Mosquito Control
Term Contract
Results
Savannah, GA 31408

Reported 02/09/2022 12:00 AM
Project Title

Campus-Wide HVAC Commissioning and Renewal

Physical Address View project details and contacts
City, State (County) Savannah, GA 31404   (Chatham County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value Less than $5,388,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: This project will integrate multiple IAQ improvement strategies into one integrated approach using design-build project delivery. The first step and foundation of these strategies will be a study of HVAC systems in most buildings on campus. The study will result in recommended HVAC systems modifications to improve IAQ and mitigate/reduce the potential for transmission of viruses and pathogens like coronavirus. Expected outcomes of the study are recommendations for building recommissioning, air handler repairs/modifications/replacements, replacement/renewal to building automation controls and programs, duct cleaning, and the installation of airborne microbial and particulate elimination technologies such as better filtration, ultraviolet lighting, bi-polar ionization, etc.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents