Similar Projects
Design and Permitting of Class I Deep Injection Well at Prineville WTP
Infrastructure
Bidding
Port Saint Lucie, FL

Potable Water Well Pump and Installation
Infrastructure
Bidding
Clermont, FL 34711

Solid Waste Flygt Pump
Post-Bid
FL

Pump W/1" NPT Ports
Post-Bid
Lakeland, FL

Replace Chiller and Pumps at USCG Sector Key West, Florida
Results
$250,000 to $500,000 est. value
Big Coppitt Key, FL 33040

New Well 16 Construction and Well 11 Abandonment
Results
Jacksonville Beach, FL 32227

Myrtle Avenue Stormwater Pump Replacement
Infrastructure
Bidding
Jacksonville, FL 32260

Purchase and Delivery of Grinder Pump with Accessories, Assembled, (Duplex Pump System)
Post-Bid
West Palm Beach, FL 33415

Repair Services for Pumps, Motors, and Other Equipment
Results
Kissimmee, FL 34741

Northwest Water Reclamation Facility Blowers and Sludge Pump Replacement and System Improvements
Infrastructure
Bidding
$3,262,076 est. value
Apopka, FL 32703

Unit 5 52 Circulating Water Pump Overhaul at Mcintosh Power Plant
Post-Bid
Lakeland, FL 33805

North Regional Water Reclamation Facility Master Reuse Wet Weather Management Well System
Results
Palmetto, FL 34221

Wells and Pressure Tank Purchase and Installation Services
Post-Bid
Fort Pierce, FL 34945

Raw Water Well #9
Results
Hallandale, FL 33009

Electric Motor Repair
Post-Bid
Cape Coral, FL 33915

Last Updated 10/21/2021 09:05 AM
Project Title

Construction of Wells 4 and 5

Physical Address View project details and contacts
City, State (County) Lady Lake, FL   (Lake County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Well #4 and #5 project consists of construction, development, and testing of two new 16" Floridan Aquifer wells set to a depth of approximately 200 feet below land surface with an additional 200 feet of open hole.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents