Similar Projects
Alki Permanent Standby Generator
Alteration
Design
$6,000,000 est. value
WA

Little Goose Dam Qualitrol Gas Analyzer
Alteration
Design
Dayton, Lacrosse, WA 99143

Hangar LED Lights
Alteration
Bidding
Fairchild Air Force Base, WA

Fire Traing Academy Generator Replacement
Alteration
Bidding
$650,000 to $96,000 est. value
Olympia, WA 98501

Prequalifying Contractors for Construction Work for 2022
Infrastructure
Post-Bid
WA 98206

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

Bellingham International Airport Replace Apron Lighting Project
Infrastructure
Results
Bellingham, WA 98225

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Rockwood Retirement Communities Infrastructure & Communications
Infrastructure
Pending Verification
Spokane, WA 99218

115 kV Control Enclosure Sky Valley Switching Station
Alteration
Bidding
Monroe, WA 98272

MHR Residential Electrical
Alteration
Post-Bid
Puyallup, WA

Bellevue Library Elevator Modernization for Car #3
Alteration
Results
Bellevue, WA 98007

Richland Airport Electrical Replacement
Alteration
Bidding
Richland, WA 99354

Electrical Construction Work Order 2021-2022
Term Contract, Alteration
Post-Bid
WA

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Last Updated 03/17/2022 04:49 PM
Project Title

Admin Building Panel Replacement

Physical Address View project details and contacts
City, State (County) Pullman, WA 99163   (Whitman County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes upgrades to the existing Wastewater Treatment Plant (WWTP) - generally including replacement of existing panelboards and transformers - removal of panelboards - and revision of conduit and wires as indicated on the contract documents.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents