Similar Projects
North West Interceptor Splitter Box Construction and Slip Lining - City of Beloit
Renovation, Infrastructure
Conception
$250,000 CJ est. value
Beloit, WI 53511

North West Interceptor Splitter Box Construction and Slip Lining - City of Beloit
Renovation, Infrastructure
Conception
$250,000 CJ est. value
Beloit, WI 53511

Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

Merrill Street Reconstruction - 77611998-92062 - City of Beloit
Infrastructure
Design
$305,000 CJ est. value
Beloit, WI 53511

2022 Water Service Replacements
Infrastructure
Post-Bid
Milton, WI

Blackhawk Technical College Public Safety Training Center Education Building - Bid Package 2: Re-Bid of Drywall and Landscaping Work Packages
New Construction, Infrastructure
Post-Bid
$3,000,000 CJ est. value
Janesville, WI 53546

Madison Avenue Water Main Replacement
Infrastructure
Results
$200,000 est. value
Milton, WI 53563

Wootton Park Pickleball Court Conversion
Infrastructure
Results
$155,000 CJ est. value
Beloit, WI 53511

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Janesville Ice Arena - City of Janesville
Demolition, New Construction, Infrastructure
Pending Verification
$33,000,000 CJ est. value
Janesville, WI 53545

Arthur Drive Mini Warehouse
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Milton, WI 53563

Hart Road Storm Water Pond - City of Beloit
Infrastructure
Conception
$400,000 CJ est. value
Beloit, WI 53511

Bergen - Emerald Grove RR OPS/ Crossing Repair/ Resurface
Infrastructure
Design
$250,000 CJ est. value
Clinton, WI 53525

UWH Med Flight Hanger
New Construction, Infrastructure
Post-Bid
$1,500,000 CJ est. value
Janesville, WI 53546

Last Updated 10/06/2023 09:09 AM
Project Title

Sanitary and Storm Sewer Lining

Physical Address View project details and contacts
City, State (County) Janesville, WI 53545   (Rock County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $1,423,165 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Janesville, Wisconsin hereby gives notice that it will receive electronic bids for the following listed Public Work: C2023-17 Sanitary and Storm Sewer Lining - For furnishing all labor, materials, equipment, and performing all work necessary for the cured-in-place (CIP) trenchless lining rehabilitation and selective joint grouting of approximately 24,500 LF of 8"- 20" diameter sanitary and storm sewer at various locations. A OneDrive link containing available video of the pipe to be lined will be sent to prime bidders only. All bidders shall bid in accordance with contract document's Section 2 'Information to Bidders'. The above Public Work will be let to the lowest responsible bidder and must be performed in accordance with the plans, specifications, and contracts on file with the City Clerk. The determination of the lowest responsible and best bid will be decided by the City Engineer, subject to review by the City Council. The Council reserves the right to reject any and all bids. No bid will be considered unless accompanied by a certified check equal to 10 percent of the bid or a bid bond in equal amount, payable to the City as guaranty that if the bid is accepted, the bidder will execute and file the proper contract and performance bond within ten days from the date the lowest responsible bidders bid is accepted. In case the bidder fails to execute such contract and performance bond within the time set by the City, the check or bid bond shall be forfeited to the City as liquidated damages. If applicable, Federal Davis Bacon wage rates are included in the Contract Documents, as well as on file in the City Clerks Office. No bidder may withdraw their bid within 45 days after the actual date of the bid opening.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents