Reported | 04/04/2021 11:20 PM |
Project Title | Forest Avenue Reconstruction |
Physical Address | View project details and contacts |
City, State (County) | West Bend, WI (Washington County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Paving/Reconstruction, Sanitary Sewers, Storm/Sewers, Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Furnish and Install Sanitary Sewer Main 1060 LF Furnish and Install Sanitary Sewer Manhole 3 EA Furnish and Install Water Main 1300 LF Furnish and Install Hydrant Assembly 3 EA Furnish and Install Storm Sewer Main and Lead 1370 LF Furnish and Install Storm Sewer Manhole 8 EA Furnish and Install Storm Sewer Catch Basin 11 EA Furnish and Place Concrete Curb and Gutter 2200 LF Furnish and Place Base Aggregate Dense 1450 CY Furnish and Place Breaker Run, Incl. Over excavation 700 CY Remove and Replace Concrete Sidewalk, 4-Inch 8500 SF Remove and Replace Concrete Sidewalk, 6-Inch 2000 SF Furnish and Place Asphalt Pavement, 5-Inch 1050 TN Furnish and Place Topsoil, Seed, Fertilizer, Mulch and Water 2500 SY Contract 21-03 is a unit price contract. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |