Similar Projects
Luverne Area Aquatics & Fitness Center
New Construction
Post-Bid
$4,300,000 est. value
Luverne, MN

Municipal Pool Gutter Replacement
Results
$400,000 to $450,000 est. value
Caledonia, MN 55901

Last Updated 03/09/2021 01:04 AM
Project Title

SCSU Halenbeck Hall Pool Improvements

Physical Address View project details and contacts
City, State (County) Saint Cloud, MN 56301   (Stearns County)
Category(s) Entertainment/Recreation
Sub-Category(s) Swimming Pool(s)
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed scope of construction is summarized as follows: a. Protect existing pool deck/basin equipment (main drain, piping, handrails, starting blocks, etc.) from damage due to construction. b. Owner to empty the pool basin prior to construction, coordinate as necessary. c. Remove the existing underwater window. Fill opening with concrete and tile to match existing pool basin. d. Remove existing lane line and safety rope cup anchors and eye bolts. Install new rope anchor eyebolts. Patch holes and restore tile to match existing. e. Remove and replace existing custom wall inlet fittings. f. Remove and replace broken/ missing pool basin tile. g. Repair instances of broken/ missing tile on the existing pool curb with grout or tile. h. Remove existing pool basin tile grout to install new tile grout. i. Clean natatorium of dust and debris due to construction. j. Owner to refill pool basin after construction is completed and the basin is cleaned, coordinate as necessary.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 09 - Finishes, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 26 - Electrical, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents