Similar Projects
Uplands WTP Trident/Office Building and High Service Pump Station Building Renovations
Renovation
Bidding
$1,750,000 to $2,250,000 est. value
Bee Cave, TX

Bay Ridge Flood Reduction Phase 2
New Construction
Bidding
League City, TX

Booster Pump Replacement Project
Post-Bid
Bellaire, TX

Reclaimed Water Pump Station
New Construction
Post-Bid
$1,070,000 est. value
TX

Booster Pump Replacement
Results

Booster Pump Replacement
Results

Bay Colony Lift Station Expansion Phase I
Construction
League City, TX 77573

Highway 84 Corridor Wastewater System Improvements Phase 2 Contract A
Construction
Less than $8,102,100 est. value
McGregor, TX 76657

Construction of the Lift Station No. 3
New Construction
Bidding
TX

Miller Ranch Road Regional Lift Station Rehabilitation
New Construction
Post-Bid
Pearland, TX 77584

Newport Pointe Lift Station Phase 1
Results
TX

Heath Street Pump Station Improvements
Construction
$2,777,000 est. value
Rockwall, TX

Sable Hills Lift Station and Force Main Improvements
Renovation
Bidding
$775,000 est. value
TX

Sewer Lift Station Pump Replacements at the Ambrosio Guillen Texas State Veterans Home
New Construction
Post-Bid
$100,000 est. value
El Paso, TX 79924

Sherwood Wastewater Lift Station & Various Upgrades
Results
Cedar Hill, TX 75104

Last Updated 04/26/2022 08:42 AM
Project Title

Well Field Collection Line Rehab Phase 1

Physical Address View project details and contacts
City, State (County) College Station, TX 77842   (Brazos County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $694,151
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the construction for replacement of approximately 310LF section of 30 inch well field collection line and appurtenances connection Sandy Point Pumping Station to the intersection of Sandy Point Road and Creekside Drive. The rehabilitation phase is generally within the Sandy Point Pumping Station fenced area.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents