Similar Projects
Watermark Residential
New Construction
Conception
$1,000,000 to $5,000,000 CJ est. value
Coraopolis, PA 15108

Multi-purpose Sports Center
New Construction - 70,000 SF
Conception
$13,000,000 est. value
North East, PA 16428

Community Center
New Construction - 6,860 SF
Design
$850,000 est. value
Pittsburgh, PA 15224

Schmale Farm Age Restricted Housing
New Construction
Design
Birdsboro, PA 19508

Re-Bid Bryn Mawr Community Center Interior Repairs
Renovation
Bidding
$252,940 CJ est. value
Bryn Mawr, PA 19010

Re-Bid Bryn Mawr Community Center Interior Repairs
Renovation
Bidding
$252,940 CJ est. value
Bryn Mawr, PA 19010

Heroes Grove Amphitheater - Phase 3
New Construction
Post-Bid
$500,000 est. value
Harrisburg, PA 17112

Frackville Senior Center Improvements
Renovation - 3,730 SF
Post-Bid
Frackville, PA 17931

Concession Stand Project
New Construction
Results
Union City, PA 16438

Adams Park Picnic Shelter - General Construction
New Construction - 2,550 SF
Results
$150,000 est. value
Mars, PA 16046

Carlisle Family YMCA
Renovation, Addition - 20,000 SF
Construction
$9,000,000 est. value
Carlisle, PA 17013

Brandt Drive Residential Development
New Construction - 220,000 SF
Construction
$28,000,000 est. value
Cranberry Township, PA 16066

Spruce Street Mixed-Use Development
New Construction, Infrastructure - 149,500 SF
Pending Verification
$75,000,000 CJ est. value
Philadelphia, PA 19139

The Armory Events
Renovation - 16,389 SF
Pending Verification
Stroudsburg, PA

Esplanade - Pavilion Building
New Construction - 45,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Pittsburgh, PA 15233

Last Updated 10/03/2022 10:01 AM
Project Title

FirstEnergy Stadium Renovations

Physical Address View project details and contacts
City, State (County) Reading, PA 19605   (Berks County)
Category(s) Entertainment/Recreation
Sub-Category(s) Clubhouse/Social Club, Stadium
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $16,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for a three-story structure for clubhouses, locker room, batting tunnels, weight room, dining area, laundry facilities, equipment storage, indoor event space and enhancements. As of October 3, 2022, construction is underway. The general contractor has been confirmed and work is anticipated to be completed by April 2023.

Details

3 Stories Above Grade, Renovation, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Lighting, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents