Similar Projects
T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

The Other Place Office Development / Belton
New Construction, Infrastructure
Design
$2,500,000 CJ est. value
Belton, MO 64012

Recreation Park Trail Repairs
Infrastructure
Bidding
$354,000 CJ est. value
Raymore, MO 64083

Concrete Sidewalk Installation and Maintenance
Infrastructure
Bidding
$200,000 CJ est. value
Peculiar, MO 64078

2022 Parking Lot Improvements
Infrastructure
Post-Bid
$200,000 est. value
Belton, MO

FY 23 Street Preservation Project
Infrastructure
Post-Bid
Belton, MO

Highway 58 Waterline Replacement
Infrastructure
Results
$313,900 CJ est. value
Raymore, MO 64083

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Harrisonville, Platte City, MO

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Good Parkway Improvements - 26-PRK-001 - City of Raymore
Infrastructure
Conception
$580,000 CJ est. value
Raymore, MO 64083

Cass County Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$1,800,000 CJ est. value
Harrisonville, MO 64701

2022 Street Overlay, Curb Replacement, Storm Sewer Project
Infrastructure
Post-Bid
$220,000 est. value
Raymore, MO

Halsey to James Sanitary Sewer
Infrastructure
Results
$600,000 est. value
Harrisonville, MO

Last Updated 10/10/2023 04:50 PM
Project Title

North Scott Avenue Improvements

Physical Address View project details and contacts
City, State (County) Belton, MO 64012   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $2,541,350 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Roadway improvements including a road diet from 4-lanes to 3-lanes for the north half of the project, and a reconfiguration for on-street bicycle lanes along the project length. Sidewalks, driveways and curb ramps will be improved to make them ADA compliant. All questions concerning the bid document preparation can be directed to the City of Belton at (816) 892-1267. Project specific questions can be directed to Ryan Haupt via the previously provided phone number.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents