Similar Projects
11th Avenue south of Talmadge Street - 642444105 - City of Kearney
Infrastructure
Conception
$500,000 CJ est. value
Kearney, NE 68845

11th Avenue south of Talmadge Street - 642444105 - City of Kearney
Infrastructure
Conception
$500,000 CJ est. value
Kearney, NE 68845

Terminal Building Expansion - City of Kearney
Renovation, Infrastructure
Design
$5,000,000 CJ est. value
Kearney, NE 68847

The Catholic Newman Center
New Construction, Infrastructure - 24,000 SF
Design
$11,600,000 CJ est. value
Kearney, NE 68847

lndoor Sports Complex - 665344100 - City of Kearney
New Construction, Infrastructure
Bidding
$42,849,725 CJ est. value
Kearney, NE 68847

Wastewater Treatment Plant Replacement - City Of Kearney
New Construction
Post-Bid
$28,000,000 CJ est. value
Kearney, NE 68847

Culverts, General (All Classes)
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Kearney, NE 68847

2022 Concrete Pavement Improvements
Renovation, Infrastructure - 70,200 SF
Results
NE

Northwest Industrial Site Development - Utility Improvements
Infrastructure
Results
Elm Creek, NE

New Elementary School - Elm Creek Public Schools
Addition, Demolition, New Construction, Infrastructure
Pending Verification
$11,980,000 CJ est. value
Elm Creek, NE 68836

Evergreen Road Paving - County of Buffalo
Infrastructure
Pending Verification
$250,000 CJ est. value
Kearney, NE 68847

Turkey Creek Fourth Subdivision
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Kearney, NE 68847

Bridges, General (All Classes)
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Beaver, NE 68869

2022 Part 3 Paving Improvements
Infrastructure
Results
Kearney, NE

Rural Health Complex - University of Nebraska at Kearney
New Construction, Infrastructure
Pending Verification
$85,000,000 CJ est. value
Kearney, NE 68849

Last Updated 07/24/2023 04:17 PM
Project Title

Water Resource Recovery Facility Phase 2

Physical Address View project details and contacts
City, State (County) Kearney, NE 68847   (Buffalo County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $35,915,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 7, 2023, the project has been awarded. A timeline for construction has not been confirmed. Furnish all labor, tools, materials, equipment and incidentals required for construction of new headworks building, electrical building, two primary clarifiers, three aeration basins, back-up power, paving, yard piping, and work incidental thereto for WATER RESOURCE RECOVERY FACILITY, PHASE 2 IMPROVEMENTS. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents