Similar Projects
Pleasant Street Subdivision
New Construction
Conception
Brockton, MA 02301

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

MUNI - Rezone - Sandwich Road/Duplex - Megryco
New Construction, Infrastructure
Design
Plymouth, MA 02360

Influent Process, Secondary Treatment, and Control Building Upgrades Rebid - General Bid
Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Hull, MA 02045

Influent Process, Secondary Treatment, and Control Building Upgrades Rebid - General Bid
Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Hull, MA 02045

Pembroke Community Center - Sub
New Construction, Infrastructure
Sub-Bidding
$18,700,000 CJ est. value
Pembroke, MA 02359

Operate and Maintain the Town of Carver's Water Supply System and Wells
Term Contract
Sub-Bidding
Carver, MA 02330

Water Main Replacement Phase 4B
Post-Bid
$1,850,000 est. value
Scituate, MA

Water Works Material
Infrastructure
Post-Bid
Abington, MA

Water Main Replacement Phase 4A
Results
Less than $3,000,000 est. value
Scituate, MA

Constructing a Water Line
Results
Carver, MA

Accord Park Drive Addition
Addition, Demolition, Infrastructure - 13,000 SF
Pending Verification
$1,500,000 CJ est. value
Norwell, MA 02061

RFP Design - Owners Project Manager for Community Center
New Construction, Infrastructure
Pending Verification
$15,400,000 CJ est. value
Pembroke, MA 02359

Christ Congregational Church
New Construction, Infrastructure
Conception
$1,000,000 CJ est. value
Brockton, MA 02301

Construction of Modular Office Buildings and Associated Site Work at the Vine Street and West Grove Street (Route 28) Maintenance Depots
New Construction, Infrastructure
Bidding
$1,387,180 CJ est. value
Middleborough, MA 02346

Last Updated 08/09/2022 03:37 PM
Project Title

Underground Condensate Piping Replacement - General Bid

Physical Address View project details and contacts
City, State (County) Bridgewater, MA 02324   (Plymouth County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $2,071,466 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project includes replacement of underground condensate piping at the Old Colony Correctional Facility, replacement of piping and insulation in existing manholes, and complete refurbishment and replacement of equipment in the Pump House. The Category of Work is HVAC OR Mechanical Systems. Every General Bidder must be certified by DCAMM for no less than the bid price, plus all add alternates, if applicable.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents