Similar Projects
2020 Trail Maintenance Project
Results
West Haven, UT 84405

5500 South Curb, Gutter and Sidewalk Project
Results
Less than $93,544 est. value
Roy, UT 84067

Dfcm Construction - Dfcm Ogden Regional Center Parking Structure Surface Protection
Results
Less than $133,000 est. value
Ogden, UT

Parking Structure Demolition and New Construction
Demolition
Results
Ogden, UT

Concrete Cutting and Grinding for Two Schools
Results
$10,000 to $15,000 est. value
North Ogden, Ogden, UT 84405

Storm Water Improvement Projects
Bidding
$257,500 est. value
Riverdale, UT

2020 Sidewalk Trip Hazard Cutting
Term Contract
Results
Less than $100,000 est. value
Ogden, UT

6000 South Curb, Gutter and Sidewalk Project
Results
Less than $65,766 est. value
Roy, UT 84067

DFCM Construction-Pre-Qualified Mechanical-O/W Tech Steam Infrastructure
Results
$385,000 est. value
Ogden, UT 84404

2021 36Th Street Sidewalk Project
Results
$153,500 est. value
Ogden, UT 84412

2020 Sidewalk Spot Repairs City Wide Project
Results
Less than $500,000 est. value
Ogden, UT 84401

DFCM Construction-Pre-Qualified General Contractors-Ogden Reg. Ctr. Sidewalks/Approaches-21267310
Results
$173,397 est. value
Ogden, UT

SR-284; Weber State Preservation High Volume
Results
$500,000 to $1,500,000 est. value
UT

700 South and 1200 West CDBG Project
Results
Less than $446,804 est. value
Marriott-Slaterville, UT 84404

DFCM Construction - VBS Design/Build - WSU Noorda A2 Lot & Paid Parking Lot
Post-Bid
Less than $3,308,642 est. value

Last Updated 05/05/2021 11:15 AM
Project Title

Steam Infrastructure Phase 2

Physical Address View project details and contacts
City, State (County) Ogden, UT 84404   (Weber County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $685,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Remove and replace steam piping, condensate piping, valving, traps and supports in the steam tunnels location under a removable sidewalk. Protect existing sidewalk and removable to be reinstalled at the end of project. Coordinate with college during construction to keep required ADA and student access.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents