Similar Projects
Utility Monitoring and Control Systems
Post-Bid
Less than $2,100,000,000 est. value

Taconic Furnace Maintenance and Emergency Service
Term Contract
Post-Bid

Replacement Rooftop HVAC Units
Results
Kingston, NY

Repair Heating / Ventilation Controls at Kingston Armory
Results
$275,000 to $550,000 est. value
Kingston, NY

Replace MEP Systems at Lecture Center at SUNY New Paltz
Post-Bid
New Paltz, NY 12561

Provide Energy Efficient Retrofit at State Armory
Results
$750,000 to $1,500,000 est. value
Kingston, NY

Heating Contractors
Term Contract
Post-Bid
Kingston, NY 12401

IDIQ JOC HVAC Phase 2
Results
Less than $500,000 est. value

Water Cooled Vapor Compression and Vapor Absorption Chiller Preventative Maintenance and Repair Services
Term Contract
Post-Bid
Kingston, Poughkeepsie, Suffern, Valhalla, NY

Install Ductless Air Conditioner
Results
Less than $25,000 est. value
Saugerties, NY 12477

HVAC & Refrigeration Replacement / Maintenance
Term Contract
Post-Bid

Upgrade Lecture Center Mechanical Systems at SUNY New Paltz
Results
$5,000,000 to $10,000,000 est. value
New Paltz, NY 12561

HVAC Pneumatic Control Systems, Maintenance/Service - Campus-wide 2019
Post-Bid
New Paltz, NY 12561

HVAC Replacement for SUNY Ulster Burroughs Hall
Term Contract
Results
Stone Ridge, NY 12484

Replacement of Roof Top HVAC Units at Development Court
Term Contract
Post-Bid
Kingston, NY 12402

Last Updated 09/16/2019 08:40 AM
Project Title

HVAC Upgrade for Public Works Building

Physical Address View project details and contacts
City, State (County) Kingston, NY 12401   (Ulster County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description HVAC upgrades including the removal and replacement of nine water source heat pump units located at the Joseph Y. Resnick Department of Public Works Building located at 313 Shamrock Lane, Kingston, New York 12401.
Details
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents