Similar Projects
Utilities - US 69
Infrastructure
Design
$782,135 CJ est. value
McAlester, OK 74501

Grade, Drain, Bridge and Surface - SH 63
Infrastructure
Design
$3,050,508 CJ est. value
Arch, OK 74501

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

RFQ D/B - KC-46A 3-Bay Maintenance Hangar at Tinker AFB, Oklahoma
New Construction, Infrastructure
Post-Bid
$148,925,456 CJ est. value
Oklahoma City, OK 73145

Slabjacking and Subsealing Services
Infrastructure
Results

Resurface (Asphalt) SH-31
Infrastructure
Results
$1,614,159 est. value
OK

Reconstruct - No Added Lanes
Infrastructure
Design
$4,300,000 CJ est. value
McAlester, OK 74501

McAlester Duplexes and Affordable Rental Home
New Construction, Infrastructure
Post-Bid
$14,000,000 CJ est. value
McAlester, OK 74501

Strong Boulevard Sidewalk Phase I
Infrastructure
Results
$200,000 est. value
McAlester, OK 74501

Asphalt Road on Tanglewood Drive
Infrastructure
Post-Bid
$400,000 CJ est. value
McAlester, OK 74501

4A Steven Taylor Industrial Park System Improvements
Infrastructure
Results
$647,700 CJ est. value
McAlester, OK 74501

A New Cafeteria for Quinton Public Schools
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Quinton, OK 74561

DWSRF Project 5 School Waterline Improvements
Infrastructure
Results
$554,298 CJ est. value
McAlester, OK 74501

Alley Paving Phase II
Infrastructure
Post-Bid
$300,000 CJ est. value
Carlton Landing, OK 74425

30 Foot X 60 Foot Concrete Pad for a Future Building
Infrastructure
Results
$25,010 CJ est. value
Krebs, OK 74501

Last Updated 03/30/2023 12:13 PM
Project Title

TSET Sidewalk, Strong Blvd., Phase III

Physical Address View project details and contacts
City, State (County) McAlester, OK 74501   (Pittsburg County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $158,899 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Strong Blvd Sidewalk Phase III: Construction of approximately 2,000 linear feet of 5-foot wide concrete sidewalk along Strong Blvd from Polk Ave to Monroe Ave. The Contractor shall receive and accept the compensation as herein provided in full payment for furnishing all labor, materials, tools, equipment, and incidentals; for performing all work contemplated and embraced under the contract; for all loss or damage arising out of the nature of the work or from the action of the elements; for any unforeseen defects or obstructions which may arise or be encountered during the prosecution of the work, and before its final acceptance by the Engineer; for all risks of every description connected with the prosecution of the work; for all expenses incurred by or in consequence of suspension or discontinuance of such prosecution of the work as herein specified; for any infringement of patents, trademarks, or copyrights and for completing the work in an acceptable manner according to the specifications. The CONTRACT DOCUMENTS may be examined at the following locations: City of McAlester, 28 East Washington, McAlester, OK 74501 Infrastructure Solutions Group, LLC, 500 Village Blvd., Suite A, McAlester, OK 74501

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents