Similar Projects
Splash City Adventure Park
New Construction - 22,179 SF
Design
$9,000,000 est. value
Saint George, UT 84770

Reach Higher Performance Center
New Construction - 28,783 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Saint George, UT 84770

DFCM General and Site/Civil-Gunlock Park Campground Improvements
Renovation
Bidding
$2,160,000 est. value
Gunlock, UT 84733

Hurricane Equestrian Park Phase I
Renovation
Bidding
Hurricane, UT

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Snake Hollow Bike Park Phases 2 and 3
Post-Bid
Saint George, UT 84770

New Swiss Pioneer Memorial Park
Results
Santa Clara, UT 84765

Drainage Improvements and Pavement Maintenance Project
Results
Less than $176,000 est. value
Saint George, UT 84770

Gooseberry & Little Creek Cabins
New Construction
Pending Verification
Rockville, UT

Sky Mountain RV Park
New Construction - 5,328 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Hurricane, UT 84737

Bash Resort
New Construction
Design
Hurricane, UT 84737

Sand Hollow Aquatic Center Pool PVC Liner Replacement
Post-Bid
Saint George, UT 84770

Washington Parkway and Telegraph Street Signal Project
Results
Washington, UT 84780

RV Park
New Construction
Pending Verification
Hurricane, UT 84737

3700 West and Flora Tech Road Spot Improvement
Post-Bid
Hurricane, UT 84737

Last Updated 09/07/2021 11:47 AM
Project Title

Autocamp Zion

Physical Address View project details and contacts
City, State (County) Virgin, UT 84779   (Washington County)
Category(s) Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Clubhouse/Social Club, Park/Playground, Paving/Reconstruction, Swimming Pool(s)
Contracting Method Owner to Subcontract.
Project Status Construction Documents, Construction Start Expected September 2021
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Clubhouse/Social Club, 8,441 SF New Construction, Park/Playground, New Construction, 16.60 Acres.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Selective Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Storm Drainage Structures, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents