Similar Projects
Portland Ready Mix Concrete
Infrastructure
Bidding
$200,000 CJ est. value
Tustin, CA 92780

RFQ Bee Canyon Greenery Phase 1B Expansion
Addition, Demolition, Infrastructure
Bidding
$3,750,000 CJ est. value
Tustin, CA 92780

Tract 37509 Heirloom Street Improvements Temecula Center Dr Date Street and Ynez Road
Alteration
Post-Bid
Irvine, CA

Annual Concrete Replacement at Various Locations
Alteration
Post-Bid
$640,000 est. value
Orange, CA 92866

Omnibus Concrete Repairs
Alteration
Results
$450,000 est. value
Santa Ana, CA 92799

On-Call Asphalt Maintenance
Term Contract, Alteration
Results
Irvine, CA

Rectangular Rapid Flashing Beacons (RRFB)
Infrastructure
Bidding
$320,000 CJ est. value
Fullerton, CA 92832

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

On-Call Aspalt Seal Coat Maintenance
Alteration
Results
Irvine, CA

On-Call Concrete Sidewalk Surface Grinding
Term Contract
Post-Bid
Irvine, CA

Central Library Fountain Restoration Project
Renovation, Infrastructure
Results
Huntington Beach, CA 92648

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

LH on the Hill Letter Display
Alteration
Results
Laguna Hills, CA

Annual Local Paving Program
Term Contract
Post-Bid
Seal Beach, CA

Concrete Crack and Spall Repair at ACC Car Park 2
Alteration
Results
Anaheim, CA

Last Updated 11/23/2022 08:32 AM
Project Title

Estancia High School Theater Project

Physical Address View project details and contacts
City, State (County) Costa Mesa, CA 92627   (Orange County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $33,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

As of November 23, 2022, project has been awarded to Flint Builders Inc.. However no awarded amount was not disclosed. https://www.tribuneledgernews.com/tribune/regional/estancia-highs-42m-theater-back-on-track-in-new-location-slated-for-completion-in-2024/article_ac99e713-a916-5aa2-806c-cc50defc725e.html After ongoing debates and site relocation delayed construction plans for nearly one year, a long held promise by Newport- Mesa Unified School District to build a $42- million performing arts complex at Estancia High School is back on track. School board members Tuesday approved securing a contractor through a lease- leaseback construction delivery model that will allow the district to ____________________________________________________________________________________________________________________________________________________________________ 1. Construction of a new theater for Estancia High School, which is expected to include a new 350 seat theater, black box, lobby, and support spaces. 2. The Construction Budget is approximately +/- $33,000,000 dollars. 3. The project schedule is approximately 593 calendar days for turnover of construction: Notice to proceed is anticipated to occur on or about February 2023. Work covered by Contract Documents includes but is not limited to construction of a new one story Theater building on the Estancia High School campus in the City of Costa Mesa, consisting of a multipurpose 350 seat theater with a flexible black box theater with seating up to150, lobby and support spaces. The project will include site demolition and new site improvements. APP# 04-119635 FILE# 30-H13

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents