Similar Projects
Path Improvements
Infrastructure
Design
$496,000 est. value
Barboursville, WV

Heath Creek Slab +2
New Construction
Design
$960,000 est. value
Barboursville, WV 25504

Electric Vehicle Charging Station
Infrastructure
Bidding
$240,000 CJ est. value
Huntington, WV 25701

Huntington TMA-TAP
Infrastructure
Bidding
$900,000 CJ est. value
Huntington, WV 25701

Clock Tower Scaffolding - Cabell County Courthouse
Infrastructure
Post-Bid
$140,000 CJ est. value
Huntington, WV 25701

Financing, Development and Construction of a Baseball Stadium
New Construction, Infrastructure
Post-Bid
$1,150,000 CJ est. value
Huntington, WV 25701

CO 9 OP Bridges
New Construction, Infrastructure
Results
WV

Bridge Expansion Joint Repair System Emseal 6622C008
Renovation, Infrastructure
Results

Gimlet Hollow O/P
Demolition, New Construction, Infrastructure
Design
$1,600,000 CJ est. value
Ona, WV 25545

Milton Elementary School
New Construction, Infrastructure - 54,508 SF
Bidding
$6,400,000 CJ est. value
Milton, WV 25541

Construct Asphalt Pavement
Infrastructure
Post-Bid
$800,000 CJ est. value
Barboursville, WV 25504

Bridge Expansion Joint Repair System Silspec 6622C019
Renovation, Infrastructure
Results

Clearing of 1500 Linear Feet (More or Less) of Property Line Fence at Huntington High School
Infrastructure
Design
$100,000 CJ est. value
Huntington, WV 25701

Barboursville Pedestrian Bicycle Path
Infrastructure
Bidding
$900,000 CJ est. value
Barboursville, WV 25504

Site Preparation Package a New Davis Creek Elementary School
Infrastructure
Post-Bid
$209,000 CJ est. value
Huntington, WV 25705

Last Updated 03/23/2023 01:04 AM
Project Title

Heath Creek Slab +2

Physical Address View project details and contacts
City, State (County) Barboursville, WV 25504   (Cabell County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $4,545,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Federal Project Number : STP0010289D Type of Work : Replace Structure As of March 23, 2023, the project is in Final Planning status. The funding obligation date for the construction is June 28, 2023. WVDOT - Heath Creek Slab +2 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents