Similar Projects
New Career Technical Education Building - 2022 Bond - Umatilla School District
Addition, Demolition, New Construction, Infrastructure
Conception
$45,200,000 CJ est. value
Umatilla, OR 97882

New 4-6 School Building on South Hill - 2022 Bond - Umatilla School District
Addition, Demolition, New Construction, Infrastructure
Conception
$45,200,000 CJ est. value
Umatilla, OR 97882

US 730/4.4 Miles N of Oregon Border - Rockfall Prevention
Infrastructure
Design
$2,721,000 CJ est. value
McNary, OR 97882

Eastern Oregon variable message signs
Infrastructure
Design
$1,069,175 CJ est. value
Pendleton, OR 97801

Maxwell Canal Pump Station and Pipeline Project
Infrastructure
Bidding
$600,000 CJ est. value
Hermiston, OR 97838

RFQ Contractor - McNary Dam Navigation Lock Crane Replacement
Renovation, Infrastructure
Post-Bid
$10,000,000 CJ est. value
Umatilla, OR 97882

Camp Umatilla Entry Gate Improvements - Phase 2 and 3
New Construction, Infrastructure
Post-Bid
$2,479,000 CJ est. value
Hermiston, OR 97838

Regional Water System Improvements Phase 1 - 2023
Renovation, Infrastructure
Results
$2,808,813 CJ est. value
Hermiston, OR 97838

Regional Water System Improvements Phase 1 - 2023
Renovation, Infrastructure
Results
$2,808,813 CJ est. value
Hermiston, OR 97838

South Hill Commons - New Multi-family Affordable Housing Project
New Construction, Infrastructure - 172,202 SF
Construction
$47,000,000 CJ est. value
Pendleton, OR 97801

Sterling Ridge Apartments
New Construction, Infrastructure
Pending Verification
$15,000,000 CJ est. value
Hermiston, OR 97838

Horizon Project
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Hermiston, OR 97838

Nugent Park Playground Replacement - City of Umatilla
Renovation, Infrastructure
Conception
$576,000 CJ est. value
Umatilla, OR 97882

Pendleton Signal Upgrade Project Phase II
Infrastructure
Design
$1,510,129 CJ est. value
Pendleton, OR 97801

McLoughlin High School - Milton Freewater Unified School District
New Construction, Infrastructure
Post-Bid
$2,700,000 CJ est. value
Milton Freewater, OR 97862

Last Updated 05/09/2023 10:11 AM
Project Title

CTUIR/COU Joint Pump and Pipeline Project - Temporary Water Supply

Physical Address View project details and contacts
City, State (County) Umatilla, OR 97882   (Umatilla County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,784,136 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Within 2 working hours after the date and time designated for bid opening, the Bidders shall submit to the City the First Tier Sub-Contractors Disclosure form. If a First Tier Sub-Contractor Disclosure form is not received by 12:00 p.m. the bid will be considered NonResponsive Bids will be received for a single prime Contract. Bids shall be on a lump sum and unit price basis, as indicated in the Bid Form. All bid proposals shall be in accordance with the Instructions to Bidders. Bid approval by City Council is scheduled for the subsequent City Council meeting that occurs on the first Tuesday of the month, beginning May 2, 2023 at 6:00 p.m. A pre-construction conference will be scheduled following council approval. The project proposes the construction of a temporary water supply system to deliver raw river water from the existing CTUIR pipeline to a water treatment facility, constructed by others, south of Wanapa Road. The work will include both permanent and temporary improvements. The permanent improvements include an access road and tank pad, a pipe casing under Wanapa Road, and a standpipe on the existing CTUIR pipeline. The temporary improvements include piping and appurtenances from the standpipe to the water storage tank, the water storage tank, and piping and appurtenances from the water storage tank to a connection point with the interim water treatment facilities being constructed by others. Contractor agrees to be bound by and will comply with the provisions of 279C.840 or 40 U.S.C. 3141 to 3148. The project is funded through City of Umatilla funds and as such Oregon Bureau of Labor and Industries (BOLI) Wage Rates must be paid on this project. Each bid must contain a statement as to whether the Bidder is a resident Bidder, as defined in ORS 279.120. In determining the lowest responsible Bidder, City of Umatilla will, for the purpose of awarding the Contract, add a percentage increase on the bid of a nonresident Bidder equal to the percentage, if any, of the preference given to that Bidder in the state in which the Bidder resides. Each proposal must be submitted on the prescribed form and accompanied by a bid bond payable to City of Umatilla in an amount not less than ten percent (10%) of the amount bid. The successful Bidder will be required to furnish separate Performance and Payment Bonds of one hundred percent (100%) submitted on the prescribed forms for faithful performance of the Contract in the full amount of the Contract price. The Surety issuing the bond must have an attorney-in-fact or a principal doing business in the State of Oregon. This information must be included on the bond statement. The Contracting Agency will not receive or consider an Offer for a Public Improvement Contract unless the Offeror is registered with the Construction Contractors Board, or is licensed by the State Landscape Contractors Board, as specified in OAR 137-049-0230. Contractor shall not discriminate in obtaining required Sub-Contractors in accordance with ORS 279A.110(4). (See OAR 137-049-0440(3)). The City of Umatilla reserves the right to reject any or all proposals not in compliance with all prescribed Public Contracting procures and requirements, including the requirement to demonstrate the Bidders responsibility under ORS 279C.375(3)(b). The City of Umatilla may also reject any or all proposals for good cause, or any or all bids upon a finding of the Owner that it is in the public interest to do so, to postpone the award of the Contract for a period not to exceed thirty (30) days, and to accept that proposal which is to the best interests of City of Umatilla. For information regarding this project, contact the contract administrators, J-U-B ENGINEERS, Inc. phone (509) 783-2144,

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents