Similar Projects
Signing and Delineation
Infrastructure
Conception
$1,019,000 CJ est. value
Martin, SD 57551

Shoulder Widening, Replace Str RCBC, Approach Grading, Modify Intersection, Pipe Work; Signal
Infrastructure
Conception
$19,197,000 CJ est. value
Frederick, SD 57441

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

Tall Grass Parkway Multi-Residential Development
New Construction, Infrastructure
Design
$35,000,000 CJ est. value
Brookings, SD 57006

Fort Thompson Dental & Optometry Addition
Addition, Demolition, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
Fort Thompson, SD 57339

Big Bend Replacement of Left Abutment Collector Pipe System
Infrastructure
Bidding
$4,000,000 CJ est. value
Fort Thompson, SD 57339

2022 Culvert
Infrastructure
Post-Bid
SD

New City Hall - Watertown City Hall
New Construction, Infrastructure
Post-Bid
$1,700,000 CJ est. value
Watertown, SD 57201

Warner Track and Field - Irrigation and Grading Improvements
Renovation, Alteration
Results
$210,025 est. value
Warner, SD

423rd Avenue Structure Replacement
Infrastructure
Results
$500,000 to $1,000,000 est. value
Scotland, SD

Bond New Elementary School - Vermillion School District 13-1
Demolition, New Construction, Renovation, Infrastructure
Construction
$26,000,000 CJ est. value
Vermillion, SD 57069

Ice Arena - Bid Pack No. 2
New Construction, Infrastructure
Construction
$787,000 CJ est. value
Watertown, SD 57201

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

Clay County Jail - Clay County
New Construction, Infrastructure
Pending Verification
$39,000,000 CJ est. value
Vermillion, SD 57069

10th Avenue Bridge Replacement - City of Belle Fourche
Infrastructure
Conception
$86,200 est. value
Belle Fourche, SD 57717

Last Updated 02/08/2023 07:31 AM
Project Title

Repair RCBC Outlet with Riprap

Physical Address View project details and contacts
City, State (County) Kennebec, SD 57544   (Lyman County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $271,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

I90 - Adjacent to Exit 226 (US183) Length 0.0 As of February 08, 2023, the project is in Conceptual status. Anticipated Construction year is 2025. SDDOT - Repair RCBC Outlet with Riprap *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents