Similar Projects
Clear Creek Bank Stabilization (North of Oakland Street) - City of Ames
Infrastructure
Conception
$630,000 CJ est. value
Ames, IA 50014

Blank Park Golf Course Reconfiguration - City of Des Moines
Infrastructure
Conception
$1,315,000 CJ est. value
Des Moines, IA 50320

11th Elementary School
New Construction
Design
Urbandale, IA

43rd Street Reconstruction
Infrastructure
Design
$605,625 CJ est. value
Davenport, IA 52806

Kirn Middle School SPED Renovations
Renovation
Bidding
$500,000 CJ est. value
Council Bluffs, IA 51503

2021 Wastewater Treatment Facility Improvements
Demolition, New Construction, Renovation, Infrastructure
Bidding
$2,000,000 CJ est. value
Farnhamville, IA 50538

Readiness Center and SE Fire Station and Training Facility
LEED Certification, New Construction, Infrastructure - 114,004 SF
Post-Bid
$5,250,000 CJ est. value
West Des Moines, IA 50265

Audubon CSD MS and HS Facility Improvements - Interior
Renovation
Post-Bid
Audubon, IA 50025

Jesup Community School District ADA Improvements
Results
$289,000 est. value
Jesup, IA 50648

Seminole River Bank - Armoring and Access Improvements
Infrastructure
Results
$880,000 est. value
Cedar Rapids, IA

The Lab
New Construction, Infrastructure
Construction
$21,260,000 CJ est. value
Des Moines, IA 50309

Sixth Middle School Construction
New Construction
Pending Verification
Waukee, IA

NuStyle Residential Development / Woodbine
New Construction, Infrastructure
Pending Verification
$58,000,000 CJ est. value
Woodbine, IA 51579

Airline Drive Water Main - 66th to 70th - WA19-06 - City of Urbandale
Infrastructure
Conception
$339,000 CJ est. value
Urbandale, IA 50323

HMA Resurfacing With Milling - I-35
Infrastructure
Design
$500,000 CJ est. value
Latimer, IA 50452

Last Updated 09/12/2022 12:06 PM
Project Title

Fort Madison 7-12 and Fort Madison Pk-6 Additions and Renovations - Bid Packages 9A and 9B

Physical Address View project details and contacts
City, State (County) Fort Madison, IA 52627   (Lee County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Owner will issue an authorization letter and tax exemption certificate to the contractor and/or subcontractors for the purchase or use of building materials, supplies, and equipment to be used on this project only. No bid may be withdrawn for a period of 30 calendar days after the date of the scheduled closing time for the receipt of bids. The bids will be presented to and considered by the School Board for Fort Madison Community School District at 6:05PM September 19, 2022 in the School Board Conference Room at the Fort Madison Community School District Administration Office located at 1930 Avenue M, Fort Madison, IA 52627, and such proposals received will be acted upon at such time and place or at such later time and place as may then be fixed. MBI plan deposit cards are also an acceptable method of deposit for documents. Unsuccessful bidders must return their drawings and specifications to Action Reprographics or Carl A. Nelson & Company in good condition, and within 14 days of the award of contracts in order to receive a refund of their deposit. Deposit checks shall be sent to Action Reprographics and made payable to Fort Madison Community School District. All bids shall be accompanied by a bid security in a separate sealed envelope as allowed by Section 26.14A of the lowa Code. Bid security in the amount of 5% of the total bid in the form of certified check, credit union share draft, or surety bond written on an original AIA Document A310, Bid Bond is required for this project. The successful bidder will be required to provide surety Performance and Payment Bonds in an amount equal to one hundred percent (100%) of the Contract Sum. The surety providing bonds must have an (A-) A.M. Best rating or better or be listed on the U.S. Department of Treasury listing of approved sureties (Department Circular 570). The cost of the Bonds shall be included in the Contract Sum. The Fort Madison Community School District School Board reserves the right to reject any and all bids, to waive informalities and technicalities, and to enter such contracts as it deems in the best interest of the School District. Bidders shall be prepared to submit a performance bond and payment bond conditioned on the faithful performance of the contract. Out-of-state bidders shall be prepared to submit an Out-of-State Contractor Bond to the Iowa Division of Labor in accordance with Chapter 91C of the Code of Iowa. By virtue of statutory authority, a preference will be given to products and provisions grown and produced within the State of Iowa, and to Iowa labor to the extent lawfully required under Iowa law. Iowa law provides that on public improvements a resident bidder shall be allowed preference as against a nonresident bidder from a state or foreign country which gives or requires a preference to bidders from that state or foreign country. The preference so allowed shall be equivalent to the preference given or required by the state or foreign country in which the nonresident bidder is a resident. All Bidders must include a completed Bidder Status Form with their bid. Failure to include the Bidder Status Form may result in the bid being deemed nonresponsive and rejected. It is the intent of the Owner to award a contract or multiple contracts to the lowest responsible, responsive bidder provided the bid has been submitted in accordance with the bidding requirements. The Owner reserves the right to waive informalities or irregularities. The Owner reserves the right to reject any or all bids. Published by order of the School Board for Fort Madison School District, Fort Madison, Iowa. General Scope: Project consists of Construction Activities required for the Fort Madison Community School District - PK-6 & 7-12 Additions & Renovations Project as described within the scope of the Contract Documents. 1. Work Included: Provide labor, materials, articles, equipment, incidentals, items, tools, services, supplies, methods, operations, skills in such quantities as may be necessary to complete Project within intent of Contract Documents. 2. Singular notations shall be considered plural where plural application is reasonably inferable. Mention or indication of extent of work under work division or specification section is done only for convenience of Contractor and shall not be construed as describing all work required under that Division or Section.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents