Similar Projects
The WHARF - Waterline
Infrastructure
Bidding
Westwego, LA

Advanced Metering Infrastructure
Infrastructure
Bidding
LA

2020 PUA CWEF Grant Improvements Altitude Valve at Elevated Storage Tank
Infrastructure
Post-Bid
Less than $65,000 est. value
Donaldsonville, LA

Saint Bernard Drinking Water Revolving Loan Fund Waterline Replacement
Infrastructure
Post-Bid
Chalmette, LA

Hoyle Creek Partial Force Main Replacement
Results
Lincolnton, NC 28092

John Hopkins Sewer Force Main Replacement
Infrastructure
Results
$707,900 est. value
Kenner, LA

Water Main Point Repairs, Water Service Connection, Water Valve and Fire Valve and Fire Hydrant Replacement at Various Sites throughout Orleans Parish
Infrastructure
Bidding
LA

Collection and Distribution Pipe and Fittings
Infrastructure
Post-Bid
Lake Charles, LA

On-Call Water Valve Operation Services
Infrastructure
Results
New Orleans, LA

Water Main Point Repairs, Water Service Connection, Water Valve and Fire Hydrant Replacement at Various Sites throughout Orleans Parish
Infrastructure
Bidding
LA

WW Collection System Rehabilitation Cured in Place Pipe
Infrastructure
Post-Bid
Lafayette, LA

43 Watermain Replacement
Infrastructure
Results
Less than $12,895,874 est. value
New Orleans, LA

Patterson Replacement Water Meter with AMR Project
Infrastructure
Bidding
LA

Improvements to Causeway Boulevard and Scott Street Sewer Lift Station
New Construction, Infrastructure
Post-Bid
Gretna, LA

Bayou Saint John, Fairgrounds, Seventh Ward Group E (FRC)
Infrastructure
Results
New Orleans, LA

Reported 01/21/2022 12:00 AM
Project Title

Thibodaux North Wastewater Treatment Plant - Phase III A, North 9th Street Sewer Force Main

Physical Address View project details and contacts
City, State (County) LA   (Lafourche County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed work consists of the construction of the new North 9th Street Sewer Force Main including approximately 11,300 linear feet of 12” sewer force main from the existing North 9th Street pumping station to the existing 14” sewer force main near the former site of the Rienzi sewer wet well on Rosedown Drive.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents