Similar Projects
Construct A Pedestrian Bridge Across The Cumberland River Connecting East Germantown To The East Bank North - 19DS0129 - Metropolitan Government of Nashville & Davidson County
Alteration
Conception
$22,139,000 est. value
Nashville, TN

New Chattanooga Federal Courthouse - City Of Chattanooga
New Construction, Infrastructure
Conception
$218,000,000 CJ est. value
Chattanooga, TN 37402

Bottled Blonde / Nashville
New Construction, Infrastructure - 25,000 SF
Design
$20,000,000 CJ est. value
Nashville, TN 37201

Mallory Valley 12 & 24" Mains Contract E
Infrastructure
Design
$1,250,000 CJ est. value
Franklin, TN 37067

Ground Base PV Array
New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Louisville, TN 37777

VTS Tullahoma Field Maintenance Shop General Purpose Bay
New Construction, Infrastructure
Bidding
$2,414,049 CJ est. value
Tullahoma, TN 37388

Substation Site Development
Infrastructure
Post-Bid
Bristol, TN

Complete Site Prep 1st Fl. Bldg. 1A SPECT-CT
Term Contract
Post-Bid
$250,000 to $500,000 est. value
Memphis, TN 38104

Gallatin Training Facility Mass Grading
Results
Gallatin, TN 37066

Emergency Rockfall Mitigation on S.R. 70 near L.M. 16.20
Results
TN

Bledsoe Fall Creek Falls Fiber Optic Expansion
Renovation
Construction
Pikeville, TN 37367

Batts Lane Townhomes
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Clarksville, TN 37040

Legacy at Highland Estates
New Construction, Infrastructure
Pending Verification
$21,000,000 CJ est. value
Columbia, TN 38401

Sulphur Springs Road - Phase 1 - City of Murfreesboro
Infrastructure
Conception
$600,000 CJ est. value
Murfreesboro, TN 37129

West Ridge High School Team Room Building
New Construction, Infrastructure
Design
$770,000 CJ est. value
Blountville, TN 37617

Last Updated 08/30/2022 09:02 AM
Project Title

High Point Tank Recoating

Physical Address View project details and contacts
City, State (County) Clarksville, TN 37042   (Montgomery County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $462,330 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 9, 2022 this project has not yet been awarded. A timeline for award has not yet been established.** **As of August 2, 2022 this project has not yet been awarded. A timeline for award has not yet been established.** The Project includes the following Work: The work to be performed (Work) consists of sandblasting, welding, pit filling and painting the High Point Tank, which is a 1.5 million gallon ground storage tank located at 423 Alabama Avenue, Clarksville, Tennessee. Additionally, certain maintenance and repair items are to be accomplished. The Contractor shall be responsible for all costs associated with sampling, disinfection, traffic control, worker protection, environmental pollution control, handling of debris, laboratory analysis, waste disposal and all other ancillary actions required to complete the Work as shown on the Drawings and as set out more fully in the Specifications. Contractor shall provide all necessary materials, labor and equipment to complete the Work. Bids are requested for the following single prime Contract. The Project has an expected duration of 150 days to Substantial Completion after the date when the Contract Times commence to run and 180 days to readiness for final payment after the date when the Contract Times commence to run. EJCDC(R) C-111, Advertisement for Bids for Construction Contract. This document is a MODIFIED version of EJCDC(R) C-111, Copyright@ 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright. This document is a MODIFIED version of EJCDC(R) C-111, Copyright(C) 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents